Successful pavement maintenance

This is the final section of a three-part series about preventive maintenance for pavements. Written by Alan S. Kercher, P.E., Kercher Engineering, Inc
February 16, 2012 Read time: 6 mins
Figure 1 - Importance of timing for preventative maintenance

This is the final section of a three-part series about preventive maintenance for pavements. Written by Alan S. Kercher, P.E., Kercher Engineering, Inc

We practice preventive maintenance in our everyday lives and possibly with agency equipment such as dump trucks and backhoes, but when it comes to maintaining our roadways, most agencies will always defer repairs until the pavements have failed, resulting in very expensive repairs. This article will provide some guidance to help an agency make the switch from a reactive "worst-first" mentality to a pro-active "best-first" approach.

Although it is a proven fact that pavement preservation is the most cost-effective long term method of managing a pavement network, few local agencies have successfully implemented such a program. Success requires that an agency implement the 3 Rs (the Right Treatment at the Right Place at the Right Time) approach. This will require the decision makers to have a clear understanding of the current condition of the pavements and the longterm consequences associated with different levels of funding. Additionally, all pavement improvement projects must be designed and constructed properly. In order to gain support of the community at large, the public must be educated as to why pavement preservation is the most cost-effective long-term approach to managing any pavement network.

The following is a brief discussion of six important issues that must be addressed in order to implement a successful Pavement Preservation Program.

I. The 3 Rs: The Right Treatment at the Right Place at the Right Time For any pavement preservation program to be successful, the right treatment must be applied at the right place at the right time. Crack sealing and surface treatments will not be costeffective if applied to a severely deteriorated pavement. All agencies need to take the following steps: 1. Select the right treatment - in order to utilise the most cost-effective treatment, agencies must take advantage of the many types of repair treatments that are available today. Every agency should try to utilise the entire maintenance and repair toolbox (see Part 2 of this Series). This includes patching, crack sealing, surface treatments (including chip seals, micro-surfacing and ultra-thin bonded overlays), overlays, as well as recycling techniques such as cold in-place recycling and full depth reclamation. However, for any of these treatments to be cost-effective, trained personnel should be utilised to determine under what conditions each treatment is appropriate.

2. Select the right road - pavement conditions must be evaluated in order to determine which streets are good candidates for each type of maintenance or repair treatment. This is typically accomplished by performing a pavement condition survey. The survey should include the evaluation of distresses such as structural and environmental cracking, material defects/aging, rutting, roughness, drainage and possibly safety issues (i.e. skid resistance).

3. Timing is everything - since there is a relatively short amount of time when preservation treatments can be cost-effectively utilised, proper timing is crucial to a successful pavement preservation program. See Figure 1.

II. Implement a Pavement Management System It can be a daunting task to keep track of the current pavement condition of each road, knowing what should be done to it, how much it will cost and when it should be repaired. Fortunately, pavement management systems are available to assist agencies in managing these costly assets. Pavement management systems will provide a systematic approach to gathering and analysing data, as well as developing long-term budget plans and presenting information in a clear, logical manner so that decision makers will understand the long term consequences of today's budgeting decisions.

Benefits of a pavement management system include:
• Contains a database with powerful analytical and optimisation tools
• Provides strong report generating and mapping (w/GIS) capabilities
• Generates long-term budgets based upon different levels of funding and "worst-first" vs.

"best-first" funding scenarios
• Creates a historical database that allows for tracking of "performance" over time
• If properly implemented, it will allow an agency to select the right treatment at the right place at the right time.

III. Developing Long-Term Budgets From a long-term theoretical standpoint, the best-first policy is the most cost-effective method of managing a roadway network. In the real world, however, it is not realistic to expect the entire budget to be spent on the streets in good condition. Most elected officials and the public would quickly disregard anyone who would suggest such a crazy plan. However, not attempting to change from a "worst-first" policy to a "best-first" policy is cheating the public.

Therefore, a compromise is necessary. In most cases, an agency should start slowly and build up a preventive maintenance program over time. For example, possibly allocate 10% to 20% of the budget in the first year towards preventive maintenance and increase by five to ten percent each year thereafter until a costeffective balance is reached.

IV. Proper Engineering Once a network-level budget is developed, trained personnel must investigate each of the streets selected and determine the full scope of work necessary for a successful project.

This includes identifying all work including crack sealing, patching, rut-filling and leveling courses necessary to ensure that the project will be successful.

Thorough contract documents must be prepared by someone experienced in writing contract documents and is knowledgeable about the type of construction activities to be covered by the documents. Quality construction starts with properly written contract documents that create a level playing field which allows the "quality conscious" contractors to have a fair shot at winning the bid. Additionally, contract documents create the "set of laws" which will govern the construction project. Weak contract documents make enforcement of proper construction techniques, as well as conflict (dispute) resolution very difficult.

V. Quality Construction Construction inspection is necessary in order to ensure that the contractor is meeting the requirements set forth in the contract documents. Having welltrained, knowledgeable inspectors present during construction will definitely help to minimise problems and will provide reliable documentation of what actually happened during the project.

VI. Public Relations Pavement preservation is founded on maintaining the streets that are in relatively good condition, not just simply spending all of the available funds on the few roads that are in the worst condition. To the average citizen, many of the roads to be repaired as part of a preservation program will appear to be in relatively good shape. As such, this new approach will most likely result in citizens complaining that money is being "wasted" on streets that are in good condition while other streets in worse condition aren't being repaired.

Minimising the number of complaints will require that the road agency educate the public in the wisdom of pavement preservation.

Related Content

  • Cold climate binder selection, a tricky business
    May 16, 2017
    Binder selection in cold climates is especially critical for extended pavement life, as Robert Otto Rasmussen, vice president and chief engineer of Transtec Group, explains. The cold climate found in regions such as Canada and the northern regions of the US and Europe poses a particular challenge to engineering a long-lasting, high-quality pavement. Pavements constructed with asphalt in those regions are affected by the asphalt binder’s sensitivity to temperature. Choosing a binder wisely is imperative for
  • Airport's high demands on asphalt and concrete techniques
    July 11, 2012
    Airport runway, taxiway and parking areas make high demands on paving requirements, both with concrete and asphalt techniques. Mike Woof reports. High quality surface finishes are required in airport environments for runways, taxiways and aircraft parking areas. Because of the speed at which aircraft take off and land and the massive forces exerted due to the weight of the aircraft, particularly during landing, runway structures need to be incredibly strong. The surfaces also have to be constructed to very
  • The paperless construction site
    August 9, 2019
    Digitalization is changing the construction industry faster than expected. Automation, additional sensors and the networking of machines make it possible to exploit optimization potential and noticeably increase productivity. However, despite innovative working methods and digitization, the road construction process is still mainly based on one medium: paper. Paper can be used for a wide variety of purposes and offers unlimited flexibility. Construction schedules, work schedules, work sheets, mix orders
  • Philips CityTouch brings street lighting into focus
    December 20, 2016
    As far as 99% of any city’s population is concerned, street lights are just, well, there. But big changes are taking place, as explained by lighting systems provider Philips Lighting. Street lighting has been with us for more than a century. With the exception of the early 20th century switchover from gas to electricity and the recent most important invention of LEDs, there have been few obvious changes.