Successful pavement maintenance

This is the final section of a three-part series about preventive maintenance for pavements. Written by Alan S. Kercher, P.E., Kercher Engineering, Inc
February 16, 2012 Read time: 6 mins
Figure 1 - Importance of timing for preventative maintenance

This is the final section of a three-part series about preventive maintenance for pavements. Written by Alan S. Kercher, P.E., Kercher Engineering, Inc

We practice preventive maintenance in our everyday lives and possibly with agency equipment such as dump trucks and backhoes, but when it comes to maintaining our roadways, most agencies will always defer repairs until the pavements have failed, resulting in very expensive repairs. This article will provide some guidance to help an agency make the switch from a reactive "worst-first" mentality to a pro-active "best-first" approach.

Although it is a proven fact that pavement preservation is the most cost-effective long term method of managing a pavement network, few local agencies have successfully implemented such a program. Success requires that an agency implement the 3 Rs (the Right Treatment at the Right Place at the Right Time) approach. This will require the decision makers to have a clear understanding of the current condition of the pavements and the longterm consequences associated with different levels of funding. Additionally, all pavement improvement projects must be designed and constructed properly. In order to gain support of the community at large, the public must be educated as to why pavement preservation is the most cost-effective long-term approach to managing any pavement network.

The following is a brief discussion of six important issues that must be addressed in order to implement a successful Pavement Preservation Program.

I. The 3 Rs: The Right Treatment at the Right Place at the Right Time For any pavement preservation program to be successful, the right treatment must be applied at the right place at the right time. Crack sealing and surface treatments will not be costeffective if applied to a severely deteriorated pavement. All agencies need to take the following steps: 1. Select the right treatment - in order to utilise the most cost-effective treatment, agencies must take advantage of the many types of repair treatments that are available today. Every agency should try to utilise the entire maintenance and repair toolbox (see Part 2 of this Series). This includes patching, crack sealing, surface treatments (including chip seals, micro-surfacing and ultra-thin bonded overlays), overlays, as well as recycling techniques such as cold in-place recycling and full depth reclamation. However, for any of these treatments to be cost-effective, trained personnel should be utilised to determine under what conditions each treatment is appropriate.

2. Select the right road - pavement conditions must be evaluated in order to determine which streets are good candidates for each type of maintenance or repair treatment. This is typically accomplished by performing a pavement condition survey. The survey should include the evaluation of distresses such as structural and environmental cracking, material defects/aging, rutting, roughness, drainage and possibly safety issues (i.e. skid resistance).

3. Timing is everything - since there is a relatively short amount of time when preservation treatments can be cost-effectively utilised, proper timing is crucial to a successful pavement preservation program. See Figure 1.

II. Implement a Pavement Management System It can be a daunting task to keep track of the current pavement condition of each road, knowing what should be done to it, how much it will cost and when it should be repaired. Fortunately, pavement management systems are available to assist agencies in managing these costly assets. Pavement management systems will provide a systematic approach to gathering and analysing data, as well as developing long-term budget plans and presenting information in a clear, logical manner so that decision makers will understand the long term consequences of today's budgeting decisions.

Benefits of a pavement management system include:
• Contains a database with powerful analytical and optimisation tools
• Provides strong report generating and mapping (w/GIS) capabilities
• Generates long-term budgets based upon different levels of funding and "worst-first" vs.

"best-first" funding scenarios
• Creates a historical database that allows for tracking of "performance" over time
• If properly implemented, it will allow an agency to select the right treatment at the right place at the right time.

III. Developing Long-Term Budgets From a long-term theoretical standpoint, the best-first policy is the most cost-effective method of managing a roadway network. In the real world, however, it is not realistic to expect the entire budget to be spent on the streets in good condition. Most elected officials and the public would quickly disregard anyone who would suggest such a crazy plan. However, not attempting to change from a "worst-first" policy to a "best-first" policy is cheating the public.

Therefore, a compromise is necessary. In most cases, an agency should start slowly and build up a preventive maintenance program over time. For example, possibly allocate 10% to 20% of the budget in the first year towards preventive maintenance and increase by five to ten percent each year thereafter until a costeffective balance is reached.

IV. Proper Engineering Once a network-level budget is developed, trained personnel must investigate each of the streets selected and determine the full scope of work necessary for a successful project.

This includes identifying all work including crack sealing, patching, rut-filling and leveling courses necessary to ensure that the project will be successful.

Thorough contract documents must be prepared by someone experienced in writing contract documents and is knowledgeable about the type of construction activities to be covered by the documents. Quality construction starts with properly written contract documents that create a level playing field which allows the "quality conscious" contractors to have a fair shot at winning the bid. Additionally, contract documents create the "set of laws" which will govern the construction project. Weak contract documents make enforcement of proper construction techniques, as well as conflict (dispute) resolution very difficult.

V. Quality Construction Construction inspection is necessary in order to ensure that the contractor is meeting the requirements set forth in the contract documents. Having welltrained, knowledgeable inspectors present during construction will definitely help to minimise problems and will provide reliable documentation of what actually happened during the project.

VI. Public Relations Pavement preservation is founded on maintaining the streets that are in relatively good condition, not just simply spending all of the available funds on the few roads that are in the worst condition. To the average citizen, many of the roads to be repaired as part of a preservation program will appear to be in relatively good shape. As such, this new approach will most likely result in citizens complaining that money is being "wasted" on streets that are in good condition while other streets in worse condition aren't being repaired.

Minimising the number of complaints will require that the road agency educate the public in the wisdom of pavement preservation.

Related Content

  • A new road maintenance approach developed jointly can improve efficiency
    April 11, 2013
    Innovative road maintenance solutions in Austria. A sophisticated system for managing maintenance tasks has been developed in Austria to meet the specific needs of a highway concession package. Bonaventura Straßenerhaltungs-GmbH is a 100%-owned business of the French company Egis Road Operation S.A., and was founded to provide the road maintenance services of the first Austrian PPP infrastructure project "Ypsilon"(PPP-Ostregion, Paket 1) granted by ASFINAG. The concessionaire won a 30-year contract in 2006
  • Rubber recycling for South African roads
    November 5, 2012
    South Africa takes crumb rubber use to the next level - *Anders Marschall Jensen The preservation of the environment is a global concept, and in the road construction industry, it is all about preservation of roads. In earlier days, roads were built with the primary goal of moving passenger traffic from one place to another, but these days, roads are very different. Not only is there passenger traffic, and more of it, but roads must also deal with extensive movement of products in heavy vehicles. Therefore,
  • Efficient construction leads to quality roads
    November 30, 2012
    Technology to assist the installation of quick laying, yet top-quality, road surfaces requiring less frequent repair, thus limiting costs and the number of construction sites, is being sought by highways authorities the world over. The European Union devised project ASPHALT (Advanced Galileo Navigation System for Asphalt Fleet Machines) for satellite navigation and fleet management may have found just what such authorities are looking for. Within the scope of the ASPHALT research project MOBA, together wit
  • Winter maintenance challenge
    February 29, 2012
    Many countries had their most severe winter for years, but it could have been much worse without the right equipment and technology as Patrick Smith reports. As many countries faced up to the 2010-2011 winter, hard-pressed maintenance teams did their best to keep things moving on the roads. With some of the lowest temperatures and heaviest snowfalls on record, the UK, Republic of Ireland, Switzerland, France, Scandinavia, Germany, and Belgium were among those affected. Russia, eastern Europe and the USA did