Skip to main content

Newly constructed low-noise asphalt surface fails

Questions are being asked over the construction of a new section of the A1 autobahn in Germany. The highway stretch is being scrutinised due to surface failures and lies close to the city of Bremen but has been open for less than three months.
May 15, 2012 Read time: 1 min
Questions are being asked over the construction of a new section of the A1 autobahn in Germany.

The highway stretch is being scrutinised due to surface failures and lies close to the city of Bremen but has been open for less than three months.

The road carries around 70,000 vehicles/day and its construction was intended to reduce congestion between the port cities of Hamburg and Bremen. Numerous potholes are reported to have appeared in the surface of the highway. Given the recent severe weather, failures of older road surfaces are expected but these problems should not occur on links that have been so recently completed.

The investigations will focus on how water penetration into joints could have already caused the freeze-thaw process to break up the running surface or whether other problems such as material segregation or incorrect mix design could have been factors. The low-noise asphalt surface is crumbling at various points along the 73km section recently opened.

Related Content

  • Digital solutions for accurate road construction
    November 19, 2021
    Construction firms are now delivering roads that are more durable and feature better surface quality due to the use of digital measurement solutions. These technologies help to transfer target values into precise actual values on the ground
  • Roo'd Awakening and BMW Drivers
    June 29, 2018
    A rider amongst a group of cyclists on a training run in Australia had a rather unpleasant experience. The man was cycling along a road with his team mates when a young kangaroo jumped out from the road side and collided with him, knocking him from his bicycle. Although he was riding at speed at the time, he was not seriously hurt and as one of his team mates filmed the incident, will have video footage to better remember the incident by. The feelings of the kangaroo over the incident were not recorded.
  • Three Colombian bridge projects commencing
    January 17, 2019
    In Colombia progress is being seen on three major bridge projects located in different parts of the country. Construction of the new Pumajero Bridge is well in hand and is expected to be complete before the end of 2019. The new PumajeroBbridge will be 2,247m in length and have 990m of viaduct connections and access, as well as two three-lane carriageways on each side. Once the new bridge is open to traffic, the old cable-stayed concrete link between Baranquilla and Sitionuevo will be demolished. The new
  • Use 3D modelling to advance sustainable highway construction best practices
    April 30, 2025
    When it comes to advancing highway sustainability, the role of 3D modeling and digital technologies in road construction is becoming ever-more important. Anna Liza Montenegro, director of marketing at Microsol Resources explains why your business needs to get involved now.