Skip to main content

Newly constructed low-noise asphalt surface fails

Questions are being asked over the construction of a new section of the A1 autobahn in Germany. The highway stretch is being scrutinised due to surface failures and lies close to the city of Bremen but has been open for less than three months.
May 15, 2012 Read time: 1 min
Questions are being asked over the construction of a new section of the A1 autobahn in Germany.

The highway stretch is being scrutinised due to surface failures and lies close to the city of Bremen but has been open for less than three months.

The road carries around 70,000 vehicles/day and its construction was intended to reduce congestion between the port cities of Hamburg and Bremen. Numerous potholes are reported to have appeared in the surface of the highway. Given the recent severe weather, failures of older road surfaces are expected but these problems should not occur on links that have been so recently completed.

The investigations will focus on how water penetration into joints could have already caused the freeze-thaw process to break up the running surface or whether other problems such as material segregation or incorrect mix design could have been factors. The low-noise asphalt surface is crumbling at various points along the 73km section recently opened.

Related Content

  • Battery Power
    August 10, 2012
    In the UK mobility scooter sales are soaring, with overcrowding and traffic jams becoming a problem in certain areas. The battery powered scooters are supposed to be driven solely by the disabled, however a new breed of tarmac terror has appeared in the shape of the severely lazy. Questions are being asked in the corridors of power as to why comparatively young and healthy people are now using mobility scooters. Many owners are aged or disabled but there are growing numbers of users who are not. This is pro
  • Improved autobahn link for German city Bremen
    October 31, 2014
    The German Government has given the go-ahead for planning a new autobahn section in Bremen. The Ministry of Transport says that the work will be carried out to a section of the A281 autobahn that connects the A1 and the A27. The section lies between Bremen-Airport-Stadt and Bremen-Kattenturm. The work is expected to cost some €142 million. A representative of DEGES, the engineering company that is coordinating the project, has said that that work could start in January 2016.
  • Environmental impact drives warm mix growth
    November 14, 2012
    Warm mix asphalt can save energy and the environment, cutting emissions of carbon dioxide and other harmful gases, but are environmental arguments enough for clients and contractors? Kristina Smith asks Though popular in the United States, warm mix asphalt is still a technology waiting to happen in the rest of the world. Chemical companies who imagined a meteoric rise in sales are still waiting for the right economic conditions to allow warm mix to start taking serious market share from hot mix. “In Europe
  • Cifa gets pumped over final work on Milan bypass
    May 14, 2015
    Truck-mounted concrete pumps from the manufacturer Cifa have been working around the clock at one of Italy’s most prestigious road infrastructure projects, the Milan Outer Bypass. The toll motorway project, known by the TEEM acronym from the Italian name Tangenziale Est Esterna di Milano, involves 32km of new carriageway consisting of three lanes in each direction in addition to an emergency lane. The route winds through agricultural land and connects the A4 highway (Milano-Venezia) in the north to the A