Skip to main content

Removing runway rubber

When Dubai Airport contacted Waterblasting Technologies it faced a number of challenges.
February 20, 2012 Read time: 2 mins
When Dubai Airport contacted Waterblasting Technologies it faced a number of challenges.

One was finding a waterblasting system that would operate successfully in the 42º-52ºC daylight heat of the summer and also to find the fastest and most productive waterblasting system because of very limited runway closure time.

Chemicals, shotblasting and other waterblasting equipment had been tried on the runways, but eventually engineers and management chose the Stripe Hog SH8000T manufactured by 362 Waterblasting Technologies.

The system, which can be built on a variety of truck chassis, uses needle sharp water jets to quickly remove all types of roadway and airfield marking paint as well as runway rubber deposit build-up.

According to the company the Dubai airport runways is probably the most challenging rubber removal environment in the world with an average of 800-plus movements a day with summer-time peaks of 1,100/day and an average of only 5-10 days of rain each year.

"With the ability to remove runway rubber deposits on average of 1,672m²/hour and the ability to operate in the extreme heat without breaking down, the SH8000T became the product of choice for the Dubai airport," says Waterblasting Technologies, which also offers the SH8000T or the new SH8000R with optional, on-board water recycling.

For more information on companies in this article

Related Content

  • Auckland’s future strategic transport requirements
    July 5, 2012
    The Auckland Harbour Bridge is at the stage that it cannot cope with much more traffic, yet the population of the Auckland region continues to grow at a steady rate. Coupled with that, the bridge is a key link in the most important transport corridor in the country, State Highway One. Without it, the country would struggle to function. Not only home to New Zealand's largest city and one third of its population, Auckland's port is one of the country's largest. Some 140m north of the city is Marsden Point, th
  • What’s new and what’s next in sustainable asphalt production
    May 10, 2021
    Maximising sustainability is a key driver in asphalt production as Dr Hans-Friedrich Peters at Ammann believes
  • Lighting can affect road safety
    February 5, 2013
    New research carried out jointly by the Lighting Research Center and Penn State have identified links between visibility and safety from roadway lighting. The results are said to hold promise for predicting the safety benefits of new lighting configurations. Identifying when and where to install roadway illumination is a challenge for transportation agencies. Estimating nighttime crash reductions from roadway lighting is difficult in part because lighting tends to be installed along with other improvements
  • MASSENZA's advanced tank
    February 15, 2012
    MASSENZA, which manufactures bitumen handling equipment for worldwide export, is offering the latest and more advanced model of emulsion spraying tank, which has already received "very positive feedback from many contractors." This state-of-the-art unit is equipped with a small hot oil heater completely designed by MASSENZA, and this allows for a more gentle heating up of bituminous product inside the tanks, avoiding emulsion settlement and piping clogging problems (which could be there if direct flame burn