Skip to main content

XCMG’s RP953E paver and other machines in demand in Asia

XCMG’s RP952 paver and XP262 compactor are said to be playing a leading role in the reconstruction and expansion of the busy Hohhot-Baotou section of the Beijing-Tibet Expressway. The major project within north China’s Inner Mongolia autonomous region began in the summer of 2011. It was deemed crucial due to the Hohhot-Baotou section suffering from constant traffic jams, sometimes said to be stretching up to 100kms. The new eight rather than four-lane section of the Beijing-Tibet Expressway is due to open t
June 24, 2013 Read time: 2 mins
XCMG construction machines are said to be playing a leading role in the reconstruction and expansion of the Hohhot-Baotou section of the Beijing-Tibet Expressway
2490 XCMG’s RP952 paver and XP262 compactor are said to be playing a leading role in the reconstruction and expansion of the busy Hohhot-Baotou section of the Beijing-Tibet Expressway.

The major project within north China’s Inner Mongolia autonomous region began in the summer of 2011. It was deemed crucial due to the Hohhot-Baotou section suffering from constant traffic jams, sometimes said to be stretching up to 100kms. The new eight rather than four-lane section of the Beijing-Tibet Expressway is due to open to the public in August 2013.

The XCMG machines, like others involved in the works, have had to work through harsh winters. XCMG says that various Chinese media use terms such as “frozen expressway” when referring to the Hohhot-Baotou section of the Beijing-Tibet Expressway during wintertime.

XCMG says it has provided a whole set of construction solutions for the project which they say have performed excellently, drawing praise from members of the project team. Meanwhile, an XCMG RP953E paver is a key machine in the Chishui-Wangmo Highway construction project in Guizhou province, south west China.

The Chinese firm claims the model is the “masterpiece” of its three large paver model series as well as a key machine within its road construction model portfolio for 2013. XCMG said its latest road construction machines have achieved a “great breakthrough” in seven key and core technologies through independent research and learning from the experience of designing previous machine models.

For more information on companies in this article

Related Content

  • Booming BICES buoyant, with strong attendance
    September 22, 2015
    There was strong attendance at the first day of the BICES 1025 construction equipment exhibition in Chinese capital Beijing on the 22nd of September. Muggy weather and heavy traffic congestion failed to dissuade a large number of attendees visiting the show, located at the new exhibition centre close to Beijing Airport. For those opting to travel to the event by public transport, the proximity of the trade fair centre to the metro system made journeys highly convenient.
  • A bridge of hope?
    July 18, 2012
    As Russia prepares for a major Asia Pacific conference in nearly four years' time, the economic climate is felt in other countries in the region. Patrick Smith reports AUS$1 billion-plus suspension bridge is to be built to link the city of Vladivostok in the far east of Russia and Russky Island. Russia's President Dmitry Medvedev has signed an instruction for construction of the 3,150m long bridge, which is intended to provide access to the 24th Asia Pacific Economic Cooperation (APEC) summit, to be held o
  • China’s Henan Province is spending on road development
    October 4, 2021
    China’s Henan Province is spending heavily on road development works.
  • Approval given for expressway in China’s Anhui Province
    March 10, 2014
    Official approval has been given to the feasibility report for the Chuzhou-Huainan Expressway project in China’s Anhui province. Construction of the US$1.35 billion expressway will be carried out during 2014 and the projects is due for be completion within 3 years. The 125km route will feature four lanes in either direction and will have a speed limit of 120km/h. The expressway project includes seven interchanges.