Skip to main content

Volz makes headway in Hesse

A road contractor in Germany is making use of a sophisticated logistics tool to run its operations more efficiently. The contractor, Wilhelm Schütz, is a medium-sized company with a long history in road construction and civil engineering. Based in Hesse, the firm has its own mixing plant to supply material to its road construction crews.
November 22, 2018 Read time: 3 mins
German road contractor Wilhelm Schütz was already familiar with BPO tools from Volz Consulting

A road contractor in Germany is making use of a sophisticated logistics tool to run its operations more efficiently. The contractor, Wilhelm Schütz, is a medium-sized company with a long history in road construction and civil engineering. Based in Hesse, the firm has its own mixing plant to supply material to its road construction crews.

The firm was looking to optimise its operations in a bid to boost efficiency and reduce waste, using the latest tools intended for the digitisation of existing processes and processes. The company’s weighing system had been in use for 15 years and was a key link for improving overall performance.

The construction company was already familiar with technology solutions from 8820 Volz Consulting. As a result, Wilhelm Schütz, opted to introduce the software system for raw material production as this would allow the firm to use a complete system from one manufacturer.

The BPO Baustoff package can be used for the value chain, from operation and resource management to merchandise management, such as purchasing, sales, invoicing, freight accounting, production data collection, production and logistics. Users of the package can employ it for material production as well as road milling and paving applications.

Due to real-time networking, data such as delivery notes, invoices, material orders and offers can be exchanged. Deliveries of minerals from an asphalt mixing plant can be monitored automatically and need only to be confirmed. Raw material orders can be transmitted electronically, reducing order costs.

For Wilhelm Schütz, direct networking with its BPO Asphalt package meant that the firm could automatically exchange delivery note data as well as schedule data automatically between both systems, but without manual input. This could offer time saving for internal processes. This has now provided a better flow of information, with fewer searches and queries while at the same time providing leaner structures and lower administrative costs.

The weighing supervisor is presented with all planned material deliveries for the respective day. Due to the search and copy options, documents can be created efficiently and incorrect entries can be avoided.

As delivery notes are electronically signed on a signature pad and at the same time stored as PDF in an archive, the weighing supervisor can focus on important tasks at the balance. It is also possible to assign the articles to the applicable Construction Products Regulation - all prescribed contents are clearly displayed on the delivery note.

Price variants can be deposited in the software and any assignments are now automatic. Previously, prices had to be entered manually, rechecked and corrected if necessary. The connection to financial accounting programs has also been simplified.

"We can handle the entire business process from quoting, order management, weighing, mass control to billing in one program,” said Steffen Richter, operations manager for the mixing plant.

“For us, this means a better overview and much time savings. The changeover process and the training of our employees took place in a short time and without any problems. By integrating BPO Asphalt, the construction progress can be tracked in real time and the coordination of material flows is facilitated. The site manager in the office can also follow the construction progress online," he said.

For more information on companies in this article

Related Content

  • Asphalt plants reduce emissions, increase efficiency
    February 20, 2012
    Solutions for a reduction in emissions, recycling and more efficiency are being introduced by major asphalt plant manufacturers as Patrick Smith reports. The demand to reduce all types of emissions and increase the use of recycled material has put pressure on industry to come up with answers, and asphalt production is no exception.
  • Better road surfaces to last longer
    August 23, 2013
    Preservation can make roads perform better and last longer - and save money in the long run. Kristina Smith reports BAM Wegen has laid the first ever half-warm porous asphalt section on a major highway in the Netherlands. The asphalt for the 500m-long test section on the A18 near Varsseveld was produced at 105°C rather than 160°C, representing a saving on energy and CO2 emissions of around 30%.
  • Advanced machine control solutions
    February 15, 2012
    Trimble has developed an array of smart solutions for GPS machine control applications, which can now be installed on a wide variety of machines from different manufacturers. The company has long had a close relationship with Caterpillar but can also install units on machines from a range of manufacturers including Case, John Deere, Komatsu, Liebherr, Roadtec and Volvo. The firm's range has developed beyond just the GPS hardware though and includes sophisticated software, which can be loaded onto a hand-hel
  • GPS guidance delivers accurate machine control
    July 12, 2012
    GPS systems for machine control can make massive reductions in operating costs for contractors. Using GPS systems for machine control can make massive reductions in operating costs for contractors and the pace of technology improvements from manufacturers has been rapid. This market segment is dominated by Leica Geosystems, Trimble and Topcon, all of which introduced an array of new products earlier this year. Topcon's dozer control system first seen in public at the Intermat show in Paris, offers notable c