Volz makes headway in Hesse

A road contractor in Germany is making use of a sophisticated logistics tool to run its operations more efficiently. The contractor, Wilhelm Schütz, is a medium-sized company with a long history in road construction and civil engineering. Based in Hesse, the firm has its own mixing plant to supply material to its road construction crews.
November 22, 2018 Read time: 3 mins
German road contractor Wilhelm Schütz was already familiar with BPO tools from Volz Consulting

A road contractor in Germany is making use of a sophisticated logistics tool to run its operations more efficiently. The contractor, Wilhelm Schütz, is a medium-sized company with a long history in road construction and civil engineering. Based in Hesse, the firm has its own mixing plant to supply material to its road construction crews.

The firm was looking to optimise its operations in a bid to boost efficiency and reduce waste, using the latest tools intended for the digitisation of existing processes and processes. The company’s weighing system had been in use for 15 years and was a key link for improving overall performance.

The construction company was already familiar with technology solutions from 8820 Volz Consulting. As a result, Wilhelm Schütz, opted to introduce the software system for raw material production as this would allow the firm to use a complete system from one manufacturer.

The BPO Baustoff package can be used for the value chain, from operation and resource management to merchandise management, such as purchasing, sales, invoicing, freight accounting, production data collection, production and logistics. Users of the package can employ it for material production as well as road milling and paving applications.

Due to real-time networking, data such as delivery notes, invoices, material orders and offers can be exchanged. Deliveries of minerals from an asphalt mixing plant can be monitored automatically and need only to be confirmed. Raw material orders can be transmitted electronically, reducing order costs.

For Wilhelm Schütz, direct networking with its BPO Asphalt package meant that the firm could automatically exchange delivery note data as well as schedule data automatically between both systems, but without manual input. This could offer time saving for internal processes. This has now provided a better flow of information, with fewer searches and queries while at the same time providing leaner structures and lower administrative costs.

The weighing supervisor is presented with all planned material deliveries for the respective day. Due to the search and copy options, documents can be created efficiently and incorrect entries can be avoided.

As delivery notes are electronically signed on a signature pad and at the same time stored as PDF in an archive, the weighing supervisor can focus on important tasks at the balance. It is also possible to assign the articles to the applicable Construction Products Regulation - all prescribed contents are clearly displayed on the delivery note.

Price variants can be deposited in the software and any assignments are now automatic. Previously, prices had to be entered manually, rechecked and corrected if necessary. The connection to financial accounting programs has also been simplified.

"We can handle the entire business process from quoting, order management, weighing, mass control to billing in one program,” said Steffen Richter, operations manager for the mixing plant.

“For us, this means a better overview and much time savings. The changeover process and the training of our employees took place in a short time and without any problems. By integrating BPO Asphalt, the construction progress can be tracked in real time and the coordination of material flows is facilitated. The site manager in the office can also follow the construction progress online," he said.

For more information on companies in this article

Related Content

  • In control, with advanced technology
    August 15, 2019
    Machine control technology continues to advance, with new systems offering contractors major gains in working efficiency The latest developments in machine control technology once again push the bar in terms of advancements. The latest systems allow contractors to work even more effectively and efficiently than before. Doosan has unveiled one of the first uses globally of 5G technology to remotely control construction and quarrying machines. The firm has coined the term ‘TeleOperation’ to describe the
  • Fleet management system boosts efficiency
    February 28, 2012
    Efficient machine performance and utilisation optimisation can be achieved using the new BOMAG TELEMATIC fleet management system, according to the firm. The package can be used in a mixed fleet with equipment from other manufacturers, in addition to BOMAG machines. The firm claims that this system offers new opportunities for contractors and rental firms to control, monitor and schedule service work for their machine fleets.
  • Intercomp adds Bluetooth to wireless indicators
    September 30, 2020
    Intercomp has added Bluetooth to its HH60 RFX Wireless Indicators to communication weight data to Apple mobile devices using the free apps iVehicleWeigh or iExactWeigh.
  • Rebuilding the busy Frankfurt Airport in Germany
    September 12, 2017
    Handling up to 450 take-offs/day, Runway West is Frankfurt Airport’s busiest runway. Over 50% of the aircraft taking off from the airport uses Runway West, and a point worth noting is that this German airport is one of the busiest in Europe. In 2016, Frankfurt Airport handled nearly 61 million passengers, surpassed by Schiphol in Amsterdam and Charles de Gaulle in Paris, Europe’s third and second busiest airports respectively. Meanwhile London’s Heathrow remained Europe’s busiest airport