Skip to main content

Volvo CE Pavers working in Montana

Based in Montana, contractor Century Companies is now benefiting from an updated fleet of asphalt paving machines from Volvo CE. The company has operated Volvo CE’s Blaw-Knox pavers for many years and also has two Blaw-Knox PF510s, two PF3200s and a PF410 as well as Volvo DD70, DD118 and DD25B double drum compactors. However it has now added two of the 3m class P7110 tracked machines to its fleet. These were used on a job some 16km from the North Dakota border on the periphery of the Bakken Formation. This
June 23, 2015 Read time: 2 mins
Volvo CE pavers have been used on a key infrastructure job in Montana

Based in Montana, contractor 8155 Century Companies is now benefiting from an updated fleet of asphalt paving machines from 359 Volvo CE.

The company has operated Volvo CE’s Blaw-Knox pavers for many years and also has two Blaw-Knox PF510s, two PF3200s and a PF410 as well as Volvo DD70, DD118 and DD25B double drum compactors.

However it has now added two of the 3m class P7110 tracked machines to its fleet. These were used on a job some 16km from the North Dakota border on the periphery of the Bakken Formation. This area is peppered with more than 6,000 active oil wells and is the largest oil field in the world, meeting 10% of US demand.

With demand increasing, the towns in the area are having to improve infrastructure and Town Pump, a Montana fuel station and convenience store, is building a super truck stop just outside Sidney at the intersection of Montana Highway 16/200.

Century is carrying out one of its largest parking lot paving contracts, laying more than 5,000m2 of asphalt. The crew laid two 70mm compacted base mat layers and a 50mm top layer.

For more information on companies in this article

Related Content

  • Swiss mini-motorways made bigger
    July 10, 2012
    Widening the busy A4 road in Switzerland to four lanes was achieved quickly by using the latest paving technology. Increased traffic required the widening of the A4 from two to four lanes along a 20km section, with two lanes separated by a central divider in each direction. Carrying 20,000-25,000 vehicles/day, the trunk road between Winterthur and Schaffhausen was one of Switzerland's busiest two-lane stretches, and as a result, the Federal Council of Switzerland in Bern planned an enlargement of the dual-l
  • THIS is a Paving Project– The I-15 CORE
    December 20, 2012
    Provo, Utah – The scope of the I-15 Corridor Expansion Project (I-15 CORE) in the state of Utah is nearly unprecedented because of the size of the project and the short completion deadline. Twenty-four miles (38.6 km) of removal and replacement of Interstate 15 between Lehi and Spanish Fork, widening the number of traveling lanes by two, for up to six lanes in each direction in 35 months. The new 364 lane miles (586 km) of concrete roadway will be slipformed 12 or 12.5 inches (305 or 318 mm) thick for a tot
  • Improved airport for Thimarafushi atoll
    August 29, 2014
    Thimarafushi forms part of the Thaa Atoll lying in the Indian Ocean but access has been limited in the past. However the construction of a new airport planned by the Maldives Government will help develop the tourist trade, boosting the local economy. Most visitors previously used the country’s two international airports, using these as hubs for flights to the country’s six domestic airports. This has limited travel to only a few of the country’s 1,192 islands, of which around 200 are inhabited. As a result,
  • Asphalt road construction solutions demonstrated
    February 28, 2012
    Road machinery specialist BOMAG has carried out a two day demonstration event at its headquarters in Boppard, Germany.