Skip to main content

Volvo CE machines help construct and pave Polish highway

Polish contractors Salini Poland and PBDiM Kobylarnia are building a 64km section of the A1 highway between Toru (Northwest of Warsaw) and Kowale (just south of Gdansk on the Northern coast). This project will complete a key section of the highway and is being funded by the Polish road authority (GDDKiA). Worth some €107 million this is one of three schemes being undertaken by the consortium to complete the main A1 highway.
December 17, 2013 Read time: 2 mins
Volvo CE pavers form just part of the fleet of Volvo machines working on a key highway project in Poland
Polish contractors Salini Poland and PBDiM Kobylarnia are building a 64km section of the A1 highway. This project will complete a key section of the highway and is being funded by the Polish road authority (GDDKiA). Worth some €107 million this is one of three schemes being undertaken by the consortium to complete the main A1 highway.

Eko-trans, a sub-contractor for PBDiM Kobylarnia, mobilised its fleet of 359 Volvo CE articulated haulers as well as nine Volvo excavators (EW140D, EW160C and EC240CLR) and Volvo single drum soil compactors (SD115, SD122 and SD130) to carve the landscape and then create and prepare the base.

Two of PBDiM Kobylarnia’s Volvo ABG 8820 pavers are using 11m wide screeds to pave the complete carriageway in a single pass, while sub-contractor Pruszków–Drogomex is using a Volvo ABG6820 and a Volvo ABG7820 to pave the same width in echelon. Asphalt is being delivered to the pavers using Volvo trucks.

PBDiM Kobylarnia bought its second Volvo ABG8820B, specifically for this project, replacing two competing machines and offering a fuel saving of over 36%. The firm says that one of these Volvo CE pavers uses just 14litres/hour when paving a 12m width, compared with the 22litres/hour consumed by two machines from a rival working in echelon, which the company used previously for this width.

Volvo CE dealer in Poland, Volvo Maszyny Budowlane Polska is supporting the project, looking after long-term customer Pruszków–Drogomex, a contractor whose fleet of pavers is exclusively Volvo.

Related Content

  • Compacting the soil
    February 8, 2012
    High productivity and value for money are two benefits claimed by the new generation of soil compactors - Mike Woof reports. The market for soil compaction machines looks to be growing more competitive as new manufacturers enter the sector. This is particularly noticeable now that Chinese firm LiuGong has moved into the sector. Meanwhile new design concepts are also allowing firms to develop much larger and more powerful machines than ever before. The choice for contractors is a wide one and manufacturers a
  • Volvo CE upgrades key asphalt paver models
    December 13, 2018
    Volvo CE is upgrading its key asphalt paver models with the addition of its latest generation technology. The company is now fitting the sophisticated EPMIII electronic pavement management system to its new generation P6820D. This machine is also equipped with the new PaveAssist package, which allows real-time monitoring of machine parameters. The P6820D replaces the earlier C series machine, with power from the latest generation Volvo D6 engine rated at 140KW, and which meets the Stage IV/Tier 4 Final em
  • Building an airport for St Helena
    August 29, 2013
    The remote South Atlantic island of Saint Helena will shortly benefit from the construction of a new airport as well as access roads and supporting infrastructure. This is the biggest construction project in the history of the island, which lies nearly 2,000km off the coast of Africa. The airport is expected to boost economic development for the island’s 4,000 residents with an estimated 20,000 people a year forecasted to visit this highly remote, 122km2 equatorial volcanic outcrop. At present the islan
  • Volvo machines facilitate German highway construction project
    August 15, 2014
    German contractor Gebrüder Bantle is working on a large ring road project in Bösingen, excavating and building 6km of highway and nine bridges. The region’s main road, the B462, provides an important link between the A5 Rheintalautobahn and A81 Stuttgart highways. The B462 carries some 12,000 vehicles/day and suffers congestion at peak periods, so a new ring road will help reduce delays for commuters. The Dunningen project consists of a 6.4km ring road, nine bridges and several access roads. Gebrüder Bantle