Skip to main content

Vögele paver meets fine finish requirement

A new generation Vögele SUPER 1303-3i paver has been used to revamp roadways for Germany’s historic Ludwigsburg Palace grounds. The wheeled machine was used to lay coloured asphalt for the entrance area to the palace grounds. The surface quality had to meet tough requirements so as to blend with the historic location. The palace is used for state receptions and cultural events and the extensive grounds are open to the public. A number of pavement rehabilitation measures were recently implemented in the sou
April 1, 2014 Read time: 2 mins
The contractor used the Vögele paver along with Hamm compactors
A new generation 1194 Vögele SUPER 1303-3i paver has been used to revamp roadways for Germany’s historic Ludwigsburg Palace grounds. The wheeled machine was used to lay coloured asphalt for the entrance area to the palace grounds. The surface quality had to meet tough requirements so as to blend with the historic location.

The palace is used for state receptions and cultural events and the extensive grounds are open to the public. A number of pavement rehabilitation measures were recently implemented in the south gardens of the park. These included the redesign of the entrance area and rehabilitation of the footpaths with coloured asphalt.

A manoeuvrable SUPER 1303-3i wheeled compact class paver was selected to carry out the work. Equipped with the latest AB340TV extending screed, the machine suits duties on small urban roads, service roads, combined foot and cycle paths and small to medium-sized areas.
Contractors Gottlob Brodbeck carried out the work under the supervision of site manager Michael Schifer. Foreman Jernail Sing commented, “The most important factor for us in this project was that the screed worked perfectly and ensured maximum evenness. This is crucial as coloured asphalt is a very unforgiving material.”

However, the required evenness of +/- 3mm over a longitudinal distance of 3m was delivered to specification, as was the crown with a 2%.

For more information on companies in this article

Related Content

  • Istanbul’s new airport benefits from Wirtgen Group machines
    November 22, 2017
    Construction of Istanbul’s new airport facility is benefiting from the use of a large fleet of machines from the Wirtgen Group. When it is complete, this will be the world’s largest airport and will be able to handle 150-200 million passengers/year as well as 6 million tonnes of freight/year. This will make the facility substantially larger than the world’s current largest airport, the Hartsfield-Jackson Atlanta International Airport, which handles around 105 million passengers/year.
  • Vögele’s new compact asphalt paver offers sophistication
    February 17, 2016
    Vögele says that its SUPER 800-3i is compact and versatile, offering a range of pave widths extends from 0.5-3.5m. The machine can operate in confined spaces such as in towns and cities and suits duties with local authority contractors. Of note is that it has an AB 220 TV screed, a tamper vibrating model that is unusual in this compact asphalt paving class as competing models tend to feature vibration only.
  • Vögele’s new compact asphalt paver offers sophistication
    January 6, 2017
    Vögele says that its SUPER 800-3i is compact and versatile, offering a range of pave widths extends from 0.5-3.5m. The machine can operate in confined spaces such as in towns and cities and suits duties with local authority contractors. Of note is that it has an AB 220 TV screed, a tamper vibrating model that is unusual in this compact asphalt paving class as competing models tend to feature vibration only.
  • Hot-to-hot paving upgrades Bremen City Airport runway
    September 30, 2013
    A new high quality runway surface has been laid at Bremen City Airport. This has provided a much-needed replacement at the airport as the old runway was laid over 20 years ago and was suffering from cracking and potholes. Laying the new surface required the airport to be closed, with the work having to be carried out in a tight time schedule. Contractor Heitkamp Erd- und Straßenbau was brought in to carry out the work as the firm had experience in runway rehabilitation projects having carried out pavemen