Skip to main content

Tufflayer smooths out the road to Bournemouth, England

Hanson has laid over 1,000 tonnes of Tufflayer asphalt to extend the life of a section of the A338 Bournemouth Spur Road in southern England.
By Mike Woof November 29, 2019 Read time: 2 mins
Tough on reflective cracking: Tufflayer is a high-performance asphalt stress absorbing membrane interlayer (SAMI)

It was the first time in the UK that Hanson had laid its Tufflayer product which is designed specifically to address issues associated with reflective cracking.

The product was applied at Blackwater Junction near the town of Bournemouth on the south coast. The carriageway was suffering from the effects of reflective cracking caused by difficult ground conditions and the weight and volume of traffic.

Tufflayer is a high-performance asphalt stress absorbing membrane interlayer (SAMI) which incorporates Shell Cariphalte Dense Mixture bitumen to provide optimal flexibility. The company says that it is a cost-effective alternative to geogrids and is laid using conventional asphalt paving equipment. Tufflayer was used in conjunction with Hanson’s Durafalt surface course to provide a complete asphalt solution.

Tufflayer was applied at Blackwater Junction near the town of Bournemouth on the south coast. The carriageway was suffering from the effects of reflective cracking caused by difficult ground conditions and the weight and volume of traffic.

It was laid by Hanson Contracting as part of the Dorset Highways Strategic Partnership, a 10-year collaboration with Dorset County Council, said Ian Price, Hanson Contracting project manager. “Tufflayer significantly delays the effects of reflective cracking as it provides high levels of flexibility and enhanced fatigue resistance. It also creates an impermeable layer, protecting the structure of the road from water ingress.”

Tufflayer offers an alternative SAMI to geogrid asphalt reinforcing layers by providing a highly polymerised crack relief interlay solution that also protects lower layers from water ingress by creating an impermeable layer.

Laid by conventional paving equipment, Tufflayer uses Shell’s proprietary Cariphalte Dense Mixture PMB bitumen.

Tufflayer achieves optimal flexibility, enhancing fatigue resistance by significantly delaying the effects of reflective cracking. The Tufflayer design is produced from washed crushed rock fines, limestone filler and has a high bitumen content. The design has relatively low surface texture and a very low void content, making it an ideal choice for concrete overlay or applications where reflective cracking may be an issue.
 

For more information on companies in this article

Related Content

  • Longer lasting road surfaces with advanced asphalt paving
    February 20, 2012
    Contractors face an array of sophisticated paving technologies, Mike Woof reports. Asphalt paving technology continues to advance as manufacturers develop more efficient and reliable equipment. Paving techniques are also improving, while new polymer modified bitumen materials and recycling methodologies further increase the range of road surfacing options available to the client and contractor.
  • Sprayed tunnel waterproofing reduces build costs
    February 10, 2012
    Sprayed waterproofing: 'hot topic' Sprayed waterproofing is a hot industry topic, and a paper presented at the recent North American Tunnelling Conference not only discussed this method for achieving a dry tunnel but also how it can reduce build costs and construction time.
  • Asphalt plant technology meets market needs
    February 16, 2012
    Plants for mixing asphalt are becoming more sophisticated than ever, while users are looking for ecological and technological benefits. Patrick Smith reports. When the Adige Bitumi Group decided to renew its old M 260 plant it chose to collaborate with Marini for the design and development of a plant with production of 280-300tonnes/hour.
  • Bridge inspection: destructive versus non-destructive methods
    January 6, 2015
    Tens of thousands of bridges in the United States are in desperate need of repair. But where to begin analysing their deteriorating state? Roger Roberts* investigates tips and techniques for ensuring bridge safety The average age of America’s more than 600,000 crumbling bridges is 42 years – many are 60 to 80 years old. The situation is dire, with many described as functionally obsolete, according to the American Society of Civil Engineers’ latest edition of its Report Card for America’s Infrastructure.