Skip to main content

Tufflayer smooths out the road to Bournemouth, England

Hanson has laid over 1,000 tonnes of Tufflayer asphalt to extend the life of a section of the A338 Bournemouth Spur Road in southern England.
By Mike Woof November 29, 2019 Read time: 2 mins
Tough on reflective cracking: Tufflayer is a high-performance asphalt stress absorbing membrane interlayer (SAMI)

It was the first time in the UK that Hanson had laid its Tufflayer product which is designed specifically to address issues associated with reflective cracking.

The product was applied at Blackwater Junction near the town of Bournemouth on the south coast. The carriageway was suffering from the effects of reflective cracking caused by difficult ground conditions and the weight and volume of traffic.

Tufflayer is a high-performance asphalt stress absorbing membrane interlayer (SAMI) which incorporates Shell Cariphalte Dense Mixture bitumen to provide optimal flexibility. The company says that it is a cost-effective alternative to geogrids and is laid using conventional asphalt paving equipment. Tufflayer was used in conjunction with Hanson’s Durafalt surface course to provide a complete asphalt solution.

Tufflayer was applied at Blackwater Junction near the town of Bournemouth on the south coast. The carriageway was suffering from the effects of reflective cracking caused by difficult ground conditions and the weight and volume of traffic.

It was laid by Hanson Contracting as part of the Dorset Highways Strategic Partnership, a 10-year collaboration with Dorset County Council, said Ian Price, Hanson Contracting project manager. “Tufflayer significantly delays the effects of reflective cracking as it provides high levels of flexibility and enhanced fatigue resistance. It also creates an impermeable layer, protecting the structure of the road from water ingress.”

Tufflayer offers an alternative SAMI to geogrid asphalt reinforcing layers by providing a highly polymerised crack relief interlay solution that also protects lower layers from water ingress by creating an impermeable layer.

Laid by conventional paving equipment, Tufflayer uses Shell’s proprietary Cariphalte Dense Mixture PMB bitumen.

Tufflayer achieves optimal flexibility, enhancing fatigue resistance by significantly delaying the effects of reflective cracking. The Tufflayer design is produced from washed crushed rock fines, limestone filler and has a high bitumen content. The design has relatively low surface texture and a very low void content, making it an ideal choice for concrete overlay or applications where reflective cracking may be an issue.
 

For more information on companies in this article

Related Content

  • Cost-effective tunnel waterproofing
    February 14, 2012
    The strong market for shotcreting technology has led BASF to hold a workshop for waterproofing specialists. The firm's latest system can be used to provide a permanent waterproof single-shell tunnel lining based on sprayed concrete and double-bonded waterproofing membrane.
  • Foaming option
    July 16, 2012
    Foamed bitumen is a versatile and cost-effective tool in recycling roads - Mike Woof reports Wirtgen hopes to capitalise on the growing demand for materials recycling and its range of solutions for this sector has expanded considerably in recent times. The firm has been taking advantage of further developments in foamed bitumen technology to offer an array of cost-effective road repair solutions. The range allows this material to be used in array of cold recycling applications and Wirtgen also offers labora
  • Waste-full paving in Australia
    November 18, 2022
    The use of waste materials in roads, including higher proportions of RAP, is gaining ground.
  • Geosynthetics stabilise differential settlement
    May 3, 2012
    The ongoing Highways Agency A66 Carkin Moor to Scotch Corner project involves upgrading the original single carriageway to address safety concerns, particularly at junctions and crossings. Where differential settlement is threatening a remodelled junction, Tensar International's new TriAx geogrid provides an additional dimension of stability, saving design and build contractors Balfour Beatty Regional Civil Engineering Limited (BBRCEL) the heavy time and costs inherent in conventional remedial solutions and