Skip to main content

Trials completed on Klaruw's K190

Northern Ireland's Department for Regional Development Roads Service has completed trials of the Klaruwtex190 (K190) bush hammering process on sections of the A5 south of Londonderry.
February 6, 2012 Read time: 2 mins
The Klaruwtex190 bush hammering process being applied on sections of the A5 near Londonderry
Northern Ireland's Department for Regional Development 2337 Roads Service has completed trials of the Klaruwtex190 (K190) bush hammering process on sections of the A5 south of Londonderry.

Roads service engineers are evaluating the all-weather, environmentally friendly process as an option for restoring wet weather skid resistance to complement surface dressing treatments currently used.

1478 Klaruw RMS, the Widnes, northern England-based subsidiary that carries out direct contracting of the K190 process, has treated a total of 17,500m² of road surface comprising hot rolled asphalt (HRA) at two trial sites. They include a section of the A5 at Strabane and a second section near the village of Newbuildings, south of Londonderry.

According to Klaruw RMS, the K190 process provides totally controllable retexturing of any sound, natural aggregate surface course to restore micro-texture, and hence the surface friction that contributes to skid resistance. Able to operate in wet weather and with minimal traffic management, the treatment does not use any materials or hot processes and generates a minimum of arisings, resulting results in a low carbon footprint and negligible waste disposal costs.

"We would review use of the K190 process on a case by case basis, depending on the condition of the road. If a road has only about 2-3 years of service life left or is breaking up badly, it makes more economic sense to resurface," says Robert McCartney of the local Roads Service section office. "Otherwise, we can

see that K190 retexturing has definite benefits. It is not weather dependent and traffic management is less elaborate. There is no need to replace white lines or sweep up excess chippings." The Roads Service will be evaluating friction measurements for the K190 treated sites following its annual road condition surveys.

Meanwhile, Klaruw has just completed the first UK trials of its latest retexturing innovation, the Macrotex (MAT) wet application shot-blasting plant which restores macro-texture to reduce surface water aqua-planing (World Highways Eurofile, May 2010).

A prototype of the machine has been put through its paces by Area 10 managing agent contractor, A-one+, and North Wales Trunk Road Agency (NWRTA), on sections of the M56 motorway and A55 in North Wales.

For more information on companies in this article

Related Content

  • EU research projets underway
    July 19, 2012
    Several important EU-funded road research projects will impact on recycling and life-cycle thinking Three new European Union-funded road research related projects have started and they are likely to have an impact on recycling and life-cycle thinking. The RE-Road project aims to develop knowledge and innovative technologies for enhanced end-of-life strategies for asphalt roads. Such a strategy has an important impact on the energy efficiency and the environmental footprint of the European transport system a
  • High production recycling with Wirtgen
    July 14, 2021
    High throughput of quality material can be achieved using the latest KMA 240(i) unit from Wirtgen. The firm says that this unit allows material to be processed sustainably and close to the jobsite
  • Improving Rutting with Sripath’s PGXpand® PMB-Mixes
    March 1, 2023
    Indinfravit Trust, a major infrastructure investment and road projects management company in India, recently conducted a demonstration trial to laydown PGXpand-Modified-Bitumen Mixes on a highway in Rajasthan, India.
  • State of the art tunnel a conservation triumph
    May 2, 2012
    The opening of a 1.8km tunnel in southern England is designed to ease traffic bottlenecks in an environmentally sensitive area. Patrick Smith reports