Skip to main content

Trials completed on Klaruw's K190

Northern Ireland's Department for Regional Development Roads Service has completed trials of the Klaruwtex190 (K190) bush hammering process on sections of the A5 south of Londonderry.
February 6, 2012 Read time: 2 mins
The Klaruwtex190 bush hammering process being applied on sections of the A5 near Londonderry
Northern Ireland's Department for Regional Development 2337 Roads Service has completed trials of the Klaruwtex190 (K190) bush hammering process on sections of the A5 south of Londonderry.

Roads service engineers are evaluating the all-weather, environmentally friendly process as an option for restoring wet weather skid resistance to complement surface dressing treatments currently used.

1478 Klaruw RMS, the Widnes, northern England-based subsidiary that carries out direct contracting of the K190 process, has treated a total of 17,500m² of road surface comprising hot rolled asphalt (HRA) at two trial sites. They include a section of the A5 at Strabane and a second section near the village of Newbuildings, south of Londonderry.

According to Klaruw RMS, the K190 process provides totally controllable retexturing of any sound, natural aggregate surface course to restore micro-texture, and hence the surface friction that contributes to skid resistance. Able to operate in wet weather and with minimal traffic management, the treatment does not use any materials or hot processes and generates a minimum of arisings, resulting results in a low carbon footprint and negligible waste disposal costs.

"We would review use of the K190 process on a case by case basis, depending on the condition of the road. If a road has only about 2-3 years of service life left or is breaking up badly, it makes more economic sense to resurface," says Robert McCartney of the local Roads Service section office. "Otherwise, we can

see that K190 retexturing has definite benefits. It is not weather dependent and traffic management is less elaborate. There is no need to replace white lines or sweep up excess chippings." The Roads Service will be evaluating friction measurements for the K190 treated sites following its annual road condition surveys.

Meanwhile, Klaruw has just completed the first UK trials of its latest retexturing innovation, the Macrotex (MAT) wet application shot-blasting plant which restores macro-texture to reduce surface water aqua-planing (World Highways Eurofile, May 2010).

A prototype of the machine has been put through its paces by Area 10 managing agent contractor, A-one+, and North Wales Trunk Road Agency (NWRTA), on sections of the M56 motorway and A55 in North Wales.

For more information on companies in this article

Related Content

  • Variable message signs deliver real time travel information
    April 10, 2012
    Variable Message Sign systems are helping ease traffic congestion and keeping drivers better informed on key highways across Europe and the rest of the world. Guy Woodford looks at some of their recent applications By coupling its Intelligent Travel Time System (ITTS) with Bluetooth technology, Alcatel-Lucent is measuring traffic flow in real time and conveying it seamlessly to local authorities in the French city of Vélizy-Villacoublay. The city, a major business enterprise hub 14km south-west of central
  • 3M and 407 ETR have it taped on a major motorway near Toronto
    August 1, 2019
    Canadian motorway concessionaire 407 ETR, in partnership with 3M Canada, is testing 3M's pavement marking tapes for Advanced Driver Assistance Systems on 2.5km of lanes. The initiative is part of the 407 ETR Living Labs programme of innovation to promote safety and next-generation transportation along the 140km route that opened in 1997 and was extended last year. King's Highway 407 is a tolled 400-series highway in the province of Ontario comprising a privately leased segment and publicly owned segm
  • Key expressway route through Hunter Valley
    November 11, 2013
    Australia’s Hunter Valley will benefit from a new high speed expressway, which is currently under construction - Simon Gould reports Located two hours north of Sydney, the Hunter Valley region in New South Wales is one of Australia’s largest producers of coal and wine. With international demand, particularly from Asia, for both continuing to increase, a significant upgrade of infrastructure was required between the region and the port of Newcastle, the world’s largest coal export port. However the strict en
  • Washed to perfection
    July 16, 2012
    Ever tightening aggregate specifications for road surfacing materials is driving more quarries to wash their materials. Claire Symes looks at the technology and the implications for the industry Stricter aggregates specifications for both asphalt and concrete surfacing materials and the need to make the best use of all extracted material is driving greater use of washing equipment in the quarrying industry. But the latest washing and recycling technology means that this growth does not have to significantly