Skip to main content

Testing recycled cold mix asphalt

Cold mix road repair material containing 100% recycled asphalt has been laid on rural routes in northWales, UK, by the contractor Hogan Construction.Work was carried out to demonstrate that structural integrity can be restored to a failing carriageway without making use of primary aggregates or hot bitumen.
March 15, 2012 Read time: 1 min
Caterpillar rollers have been used to compact the surface course over base course designed with HiMA technology, at Port of Napier’s Kirkpatrick Wharf in New Zealand, which will deal with rutting problems on the previous surface
Cold mix road repair material containing 100% recycled asphalt has been laid on rural routes in north Wales, UK, by the contractor Hogan Construction (part of 3943 Hogan Group).Work was carried out to demonstrate that structural integrity can be restored to a failing carriageway without making use of primary aggregates or hot bitumen.

Over 500tonnes of recycled material featuring a Nymuls CP50 emulsion – supplied by 294 Nynas – was laid as a binder course on three sites this summer on behalf of local authorities in Gwynedd and Anglesey.

The cold mix material was laid and compacted at an ambient temperature before being overlaid with a surface dressing. Hogan’s Director of Business Development David Morris said: “We wanted to lay an asphalt made up of 100% recycled material because we saw the potential to reduce the use of primary aggregates in the highway maintenance process. The clients are perfectly happy with how the material has performed so far.”

For more information on companies in this article

Related Content

  • Long life asphalt paving reduces maintenance
    April 11, 2012
    Contractor FM Conway is working on a three year contract with Dover Harbour Board to reconstruct and resurface busy access routes and large vehicle parks within the port. One of the major factors for this contract being awarded was the company's strong green credentials. The contract is based around small and large individual paving projects within the Eastern Docks, which can range in time scales from three weeks to six months. The first phase of work, which started in early May, was to fully reconstruct
  • Long life asphalt paving reduces maintenance
    May 8, 2012
    Contractor FM Conway is working on a three year contract with Dover Harbour Board to reconstruct and resurface busy access routes and large vehicle parks within the port. One of the major factors for this contract being awarded was the company's strong green credentials. The contract is based around small and large individual paving projects within the Eastern Docks, which can range in time scales from three weeks to six months. The first phase of work, which started in early May, was to fully reconstruct
  • Granite pilots Volvo’s Compact Assist to new heights in Sacramento
    November 9, 2017
    While not required for its Sacramento Airport contract, Granite Construction* is getting to grips with IC specifications thanks to Volvo CE’s Compact Assist. In the US, 23 states have written intelligent compaction (IC) specifications for asphalt paving jobs and more states are expected to follow. Among those states with IC specs is California.
  • Asphalt paver performs well on difficult roads
    February 15, 2012
    Italian paving contractor VARESCO has made good use of its new AP500E paver from Caterpillar Paving on two difficult jobsites. One was a confined site with an abundance of manholes. The other one featured a road with a slope so steep the transport truck trailers were covered to prevent material from spilling out the back. The confined site required paving of an access road leading to a residential area in Merano, a town of 38,000 in northern Italy.