Skip to main content

Testing recycled cold mix asphalt

Cold mix road repair material containing 100% recycled asphalt has been laid on rural routes in northWales, UK, by the contractor Hogan Construction.Work was carried out to demonstrate that structural integrity can be restored to a failing carriageway without making use of primary aggregates or hot bitumen.
March 15, 2012 Read time: 1 min
Caterpillar rollers have been used to compact the surface course over base course designed with HiMA technology, at Port of Napier’s Kirkpatrick Wharf in New Zealand, which will deal with rutting problems on the previous surface
Cold mix road repair material containing 100% recycled asphalt has been laid on rural routes in north Wales, UK, by the contractor Hogan Construction (part of 3943 Hogan Group).Work was carried out to demonstrate that structural integrity can be restored to a failing carriageway without making use of primary aggregates or hot bitumen.

Over 500tonnes of recycled material featuring a Nymuls CP50 emulsion – supplied by 294 Nynas – was laid as a binder course on three sites this summer on behalf of local authorities in Gwynedd and Anglesey.

The cold mix material was laid and compacted at an ambient temperature before being overlaid with a surface dressing. Hogan’s Director of Business Development David Morris said: “We wanted to lay an asphalt made up of 100% recycled material because we saw the potential to reduce the use of primary aggregates in the highway maintenance process. The clients are perfectly happy with how the material has performed so far.”

For more information on companies in this article

Related Content

  • Sandvik’s Korean roots
    June 14, 2012
    Sandvik has supplied an aggregate plant to the DooWon Development Company to process granite at its Jungeub quarry in JeonRa province, South Korea. The supplied equipment is processing blasted rock from a feed size of -900mm in order to produce aggregate for the Korean construction industry, with the product fractions ranging from 0-5mm to 13-25mm, at a required rate of production of 500tonnes per hour.
  • Sandvik’s Korean roots
    June 13, 2012
    Sandvik has supplied an aggregate plant to the DooWon Development Company to process granite at its Jungeub quarry in JeonRa province, South Korea. The supplied equipment is processing blasted rock from a feed size of -900mm in order to produce aggregate for the Korean construction industry, with the product fractions ranging from 0-5mm to 13-25mm, at a required rate of production of 500tonnes per hour.
  • Eurovia meets the 100% RAP “Recyclee” challenge on a French motorway
    October 25, 2018
    Eurovia says that it has successfully paved a 1km stretch of a French motorway using 100% recycled asphalt pavement – a global first for RAP. Eurovia said that the “fully recycled road”, done in conjunction with its parent company VINCI Autoroutes, is part of a major motorway renovation project on the A10 between Pons and Saint-Aubin in southwest France. The road is the result of two years of research and a partnership with asphalt plant equipment maker Marini-Ermont of the Fayat group. Marini-Ermont
  • Efficient construction leads to quality roads
    November 30, 2012
    Technology to assist the installation of quick laying, yet top-quality, road surfaces requiring less frequent repair, thus limiting costs and the number of construction sites, is being sought by highways authorities the world over. The European Union devised project ASPHALT (Advanced Galileo Navigation System for Asphalt Fleet Machines) for satellite navigation and fleet management may have found just what such authorities are looking for. Within the scope of the ASPHALT research project MOBA, together wit