Skip to main content

Testing recycled cold mix asphalt

Cold mix road repair material containing 100% recycled asphalt has been laid on rural routes in northWales, UK, by the contractor Hogan Construction.Work was carried out to demonstrate that structural integrity can be restored to a failing carriageway without making use of primary aggregates or hot bitumen.
March 15, 2012 Read time: 1 min
Caterpillar rollers have been used to compact the surface course over base course designed with HiMA technology, at Port of Napier’s Kirkpatrick Wharf in New Zealand, which will deal with rutting problems on the previous surface
Cold mix road repair material containing 100% recycled asphalt has been laid on rural routes in north Wales, UK, by the contractor Hogan Construction (part of 3943 Hogan Group).Work was carried out to demonstrate that structural integrity can be restored to a failing carriageway without making use of primary aggregates or hot bitumen.

Over 500tonnes of recycled material featuring a Nymuls CP50 emulsion – supplied by 294 Nynas – was laid as a binder course on three sites this summer on behalf of local authorities in Gwynedd and Anglesey.

The cold mix material was laid and compacted at an ambient temperature before being overlaid with a surface dressing. Hogan’s Director of Business Development David Morris said: “We wanted to lay an asphalt made up of 100% recycled material because we saw the potential to reduce the use of primary aggregates in the highway maintenance process. The clients are perfectly happy with how the material has performed so far.”

For more information on companies in this article

Related Content

  • Urban resurfacing on tracks with Caterpillar Paving
    July 9, 2024
    A UK contractor is making good use of its latest Caterpillar’s Cat Mobil-Trac paver for urban resurfacing works – Mike Woof reports
  • Asphalt resurfacing at Miami International Airport
    February 8, 2012
    Improvements worth US$30 million are being carried out at Miami International Airport. The work includes runway resurfacing with specialist contractors having been brought in to handle the project. This is a busy facility handling some 34 million passengers/year and the work is being carried out over a period of 454 days in all, starting in September 2009 and due to finish in December 2010. The focus of attention is the upgrade to the airport's second longest runway, 8R 26L as well as the adjoining M and N
  • Asphalt paving innovations are coming
    July 28, 2023
    Innovative new machines are coming to market that will boost efficiency for the asphalt paving segment
  • Wirtgen Group machines delivering new runway for German airbase
    October 26, 2016
    Machines from the Wirtgen Group are carrying out an important reconstruction job for the surface course at Büchel Air Base. Road machinery from Hamm, Vögele and Wirtgen as well as asphalt plants from Benninghoven have been carrying out the work, delivering a new runway within a tight timeframe. To achieve this, the work had to be planned well in advance, with the contractors organising the logistics and their personnel accordingly.