Skip to main content

Tensar’s route to Euro 2012

Tensar International’s TriAx design solution has been used in the sub-base for the 17.9km Gdansk bypass in Poland. TriAx is said to be helping to combat the differential settlement across the poor soil of the Wistula river delta and to minimise frost heave caused by Poland’s severe winters. TriAx is said to be helping to combat the differential settlement across the poor soil of the Wistula river delta and to minimise frost heave caused by Poland’s severe winters.
July 20, 2012 Read time: 2 mins

Tensar International’s TriAx design solution has been used in the sub-base for the 17.9km Gdansk bypass in Poland.

TriAx is said to be helping to combat the differential settlement across the poor soil of the Wistula river delta and to minimise frost heave caused by Poland’s severe winters.

The bypass is being built as part of a programme of infrastructure improvements, including those for this month’s Euro 2012 football tournament being co-hosted by Poland and Ukraine.

“The ground has a high water level and the typical weak organic consistency of estuarine silt deposits,” said Dr Jacek Kawalec, 340 Tensar’s Eastern European business manager. “While the main support is achieved through concrete piling, the consulting engineers were concerned to reduce the effects of any possible differential settlement.

 “They asked us to provide a Tensar TriAx design solution to mechanically stabilise the sub-base of the road, so minimising any differential settlement.”

Kawalec said TriAx is quick and easy to install, and requires less aggregate than conventional road design. It also provides protection against any movement as a result of the sub-zero winter temperatures which last an average of three months.

The Gdansk bypass comprises two 3.5m wide lanes in each direction, plus 2.5m of emergency lane at each shoulder; the minimum crown width is 27m. As well as the supporting piles, vertical drains and additional embankments were employed where required. TriAx was employed across the whole width and length of the route.

The new road, started in 2009, connects Poland’s major highway (N7 to Warsaw) with the A1 motorway, the N6 and access to Gdansk harbour. The three-year US$345.9million (€272million) construction project is being co-financed by the Generalna Dyrekcja Dróg Krajowych I Autostrad and the EU Cohesion Fund.

“Traffic studies indicate that approximately 30,000 vehicles a day currently use existing routes, and estimate that there will be a reduction of 12-14,000 vehicles on these congested roads, once the new route is built,” said Kawalec.

For more information on companies in this article

Related Content

  • Key projects free up Auckland's congested motorway network
    June 14, 2012
    A number of key projects in Auckland, New Zealand will free-up the city’s congested motorway network - Mary Searle reports.Auckland is a sprawling city, home to 1.4 million people, one third of New Zealand’s total population. Until recently, greater Auckland comprised Auckland city, North Shore city over the harbour bridge to the north, Waitakere city to the west and Manukau city to the south. An amalgamation of these various cities’ councils, plus the regional council and three district councils into one,
  • Developments in noise-reducing road surfaces
    February 17, 2012
    Mixtures with special additives are being produced for roads, offering noise reduction and aiding recycling. Patrick Smith reports. Noise-reducing road surfacings have been used in motorway construction for some time. But relatively new are noise-optimised surfacings used on roads in towns that do not follow a standard concept.Road trials with these materials have taken place in Germany since 2007 and have been prioritised due to the European Union Guidelines on the Assessment and Management of Environmenta
  • Bolivia’s new highway
    October 10, 2017
    Bolivia’s new highway will provide better access into mountain areas – Mauro Nogarin writes At the beginning of 2015, work began on the construction and paving for the Tupiza - Atocha - Uyuni highway project. The route is located in Bolivia’s Potosí department: it is 189m in length and forms part of the Southwest Basic Road Network (RVF) of Bolivia. The completion of this important route is requiring funding worth US$150 million, of which 72% is being delivered through loans from the European Investment
  • Framework solutions speed bridge construction
    February 24, 2012
    Framework plays a key role in construction of bridges and other major infrastructure works – Mike Woof writes Speeding construction processes can help reduce costs considerably and the latest formwork solutions can provide significant benefits in this regard. In many projects the use of standardized and modular formwork solutions can play a key role, reducing the planning and systems required for bridge building work.