Skip to main content

Road repairs with recycling for full reconstruction

Recycling of road surfaces has resulted in restoration and full renovation of a key California route. State Highway 137 in California’s San Joaquin Valley had suffered badly from the effects of weather, traffic and general ageing and the California Department of Transportation recognised the need to improve this route. A 15km section of State Highway 137 west of Tulare, which lies about midway between Fresno and Bakersfield, in the heart of the Central Valley. The road runs through the vineyards and almo
July 15, 2015 Read time: 3 mins
This rural route required rehabilitation
Recycling of road surfaces has resulted in restoration and full renovation of a key California route. State Highway 137 in California’s San Joaquin Valley had suffered badly from the effects of weather, traffic and general ageing and the 2451 California Department of Transportation recognised the need to improve this route.

A 15km section of State Highway 137 west of Tulare, which lies about midway between Fresno and Bakersfield, in the heart of the Central Valley. The road runs through the vineyards and almond groves, and the agricultural producers appreciate the state getting the job done between spring and harvest time.

The project from the California Department of Transportation gave a tight schedule to lead contractor Papich Construction, along with its demanding road specifications. Coughlin Company, based in St George, Utah, was the sub-contractor for milling and cold-in-place recycling of the worn roadway, headed by Darren Coughlin. He said, “Our fleet includes 12 1252 Roadtec RX-900 cold planers with various cutter widths, a Roadtec RT-500 mobile recycle trailer that is fed and pulled by an RX-900, a CRMX2 Recycle Train, a Roadtec RX-400 cold planer with various cutter widths for narrow milling, a 1222 Terex CMI PR-600, two 178 Caterpillar pulverisers, two custom built cement spreader trucks, various trimmers, and various support equipment for central plant recycling and In place recycling,” he said.

The California Highway 137 road had aged and was displaying both transverse and longitudinal cracking. The rehabilitation project was ideal for cold-in-place recycle (CIR).

According to Coughlin, the benefits of CIR are substantial. He said that the Roadtec RT-500 mobile recycle trailer saves 30% in cost and 25% in time.  In addition, the process reduces reflective cracking, substantially improving the road life cycle. Using a crew of seven, Coughlin Company finished the job within the allotted 10 days. The train used was a RX 900e milling machine towing an RT 500 mobile recycle trailer, plus support equipment.

When the situation does not require CIR, the machine does duty as a cold mobile mix plant.  “It’s nice that the RT-500 recycle trailer can be set up to make cold mix from our RAP stockpile using emulsion or foam. Of course, we have options to add cement or lime if required.” The RT-500 also has a weigh bridge on board, which is designed to ensure accurate additive injection in the pugmill.

For more information on companies in this article

Related Content

  • Asphalt plant producers see major worldwide successes
    November 21, 2014
    Asphalt plant manufacturers report major supply deals for highway and construction projects - Pat Smith writes International asphalt plant manufacturers have been reporting major successes with their products, which are now working on highway and airport projects worldwide.
  • Advances in road milling technology
    June 4, 2019
    New systems developed for the road milling machine market will boost safety and efficiency
  • Cost effective road maintenance
    February 8, 2012
    Highway maintenance and repair is an easy target for cuts in highway budgets, but there are cost-effective measures that can be adopted as Patrick Smith reports. Road maintenance is an increasingly important industry that spans a worldwide market. Awareness of the need for a stable and sustainable international infrastructure, maintenance and creative rural road technologies are taking a stronger role as viable sources for a cost-effective means of preserving, developing and prolonging the life of roads wit
  • Gomaco smooth the way for new NY State concrete highway
    April 2, 2014
    When New York State Thruway wanted to experiment with unbonded concrete overlays, they chose an 8km, four-lane section of Interstate 90 near Hamburg as their test section. Surianello General Concrete, based in Buffalo, New York, won the bid to pave the 22.9cm thick concrete overlay. The age and the design of the original roadway created a major paving challenge. It was built in the 1950s and didn’t conform to current geometry requirements for superhighways. “They built it with a standard crown sectio