Skip to main content

Repair the wear in historic Béarn

The former province of Béarn in south-western France is tucked away on the eastern side of the Pyrénées-Atlantiques. Steeped in history, its strategic location controls access to easy passage into the Pyrénées Mountains, and it is said that during the Napoleonic wars, Wellington's army passed through 'the Béarn,' where it won an important battle at Orthez and set up a garrison at Pau on its way to Spain.
February 29, 2012 Read time: 2 mins
Laffitte's new Cat AP655D large asphalt paver at work in Lac
The former province of Béarn in south-western France is tucked away on the eastern side of the Pyrénées-Atlantiques. Steeped in history, its strategic location controls access to easy passage into the Pyrénées Mountains, and it is said that during the Napoleonic wars, Wellington's army passed through 'the Béarn,' where it won an important battle at Orthez and set up a garrison at Pau on its way to Spain.

Today, the area supports a rich combination of industry, agriculture, and tourism, and keeping the infrastructure up-to-date is, in part, the job of the family-owned Laffitte enterprise, which employs 40 people and specialises in utility and public works.

With the help of French dealer 2154 Bergerat Monnoyeur, Laffitte recently took delivery of a new Cat AP655D large asphalt paver with an AS4251C screed with electric heat option. The contractor selected the zrubber track undercarriage to handle a variety of paving projects. Laffitte already owned and operated Cat compactors and hydraulic excavators.

According to 178 Caterpillar, the capabilities of the MTS undercarriage were tailor made to fit the geographic variety of the region, which includes rolling hills, valleys, gorges and spectacular mountainous terrain.

The Cat paving machine commissioning crew, led by Bergerat Monnoyeur technical expert Jean-François Lahargou and three additional dealer technicians, delivered the paver and set it to work for a two-day period. Its maiden challenge was to complete a parking lot project and its entry point in the town of Lac.

Despite the heat, crews and dealer technicians completed hands-on, on site training in all machine functions, operation and maintenance. They worked together to lay down a 60mm asphalt mat for a width of 5m, learning machine functions along the way, and on day two, crews moved to another site to lay down a 50mm thick mat (width 5m) for entry roads to a canoe/slalom course.

For more information on companies in this article

Related Content

  • Developments in asphalt paver performance
    February 16, 2012
    Key additions will boost the asphalt paver offering for customers, Mike Woof reports. There are a number of key players in the asphalt paving market that see the value of investing in design, technology and performance. For customers this has resulted in a wide variety of high quality, high performance machines to choose from.
  • Airport repaving project using machine control
    April 24, 2023
    Luxembourg Airport, located in Findel, is handling a growing number of passenger as well as cargo flights. However, to meet international standards the airport’s runway, measuring 4,000m long x 60m wide, was in need of complete renovation and repair
  • Vögele Super 1803-3i wheeled paver rides high in the Swiss Alps
    December 18, 2017
    Asphalt paving is a challenge in the rough terrain of the Swiss Alps and nowhere more so than in the mountain village of Castiel. Extreme slopes, narrow roads and steep precipices place demands on the paving team and machinery. In the town of Castiel, in the Arosa district of the canton Graubünden, contractor HEW Bauunternehmung opted to use Vögele’s Super 1803-3i wheeled paver for rehabilitation of the combined base and surface course on a farm track. The site is around 1,200m above sea level and an
  • Vögele sets paving record in German capital
    September 16, 2015
    Material transfer vehicles and remixing systems are crucial to delivering quality paving. Using material transfer vehicles (MTVs) can play a major role in delivering high quality road surfaces. These units can help boost quality by minimising the risk of material or thermal segregation. A major road paving project has been carried out in Germany using innovative paving methods. For the first time ever, binder and surface courses were paved over a width of 15.5m. This paving job was carried out on a 4.2km st