Skip to main content

Puddle problem solved

A slip resistant, waterproof surface has solved the puddle problem on a footbridge in the UK. The local council was seeking a solution to the problem of water accumulation on the heavily used Angmering footbridge which extends over the A259. Contractor May Gurney, approached Gaysha Specialist Surfaces, which is a specialist in innovative resin paving products, to undertake the resurfacing work. Gaysha Specialist Surfaces laid 190m2 of Tripave, a durable rapid cure surfacing system based on methyl methacryla
February 13, 2012 Read time: 1 min
A slip resistant, waterproof surface has solved the puddle problem on a footbridge in the UK. The local council was seeking a solution to the problem of water accumulation on the heavily used Angmering footbridge which extends over the A259. Contractor May Gurney, approached 2585 Gaysha Specialist Surfaces, which is a specialist in innovative resin paving products, to undertake the resurfacing work. Gaysha Specialist Surfaces laid 190m2 of Tripave, a durable rapid cure surfacing system based on methyl methacrylate (MMA) resin technology. This product suits duties for pedestrian and traffic applications, particularly where time critical installation is a high priority. The resin surface can be expected to have a useful life of at least 10-25 years according to Gaysha Specialist Surfaces. Using the resin bound method, the aggregate and the resin are mixed together and spread over a prepared base.

For more information on companies in this article

Related Content

  • Wirtgen’s new recycling technology
    June 22, 2018
    Wirtgen is offering an array of new technologies for milling, recycling and stabilising applications. These are intended to boost accuracy, versatility and performance. A new milling drum assembly is offered that widens the range of applications that the Wirtgen W 150 CF/W 150 Cfi milling machines can handle. This redesigned assembly allows users to select an array of cutter drums, including a 1.8m-wide unit. According to the firm, the machines offer the highest power to weight ratio for their class, with d
  • State of the art tunnel a conservation triumph
    May 2, 2012
    The opening of a 1.8km tunnel in southern England is designed to ease traffic bottlenecks in an environmentally sensitive area. Patrick Smith reports
  • State of the art tunnel a conservation triumph
    February 28, 2012
    The opening of a 1.8km tunnel in southern England is designed to ease traffic bottlenecks in an environmentally sensitive area. Patrick Smith reports
  • Recycling highway material reduces waste and costs
    March 15, 2012
    The use of specialist equipment to produce hydraulically bound mixtures can save 30-40% on the cost of landfill and backfill it is claimed. The transportation and removal of old material from certain highway projects has long been a problem for contractors. But David MacLynn believes that the answer, in many instances, could lie in the use of hydraulically bound mixtures (HBM), which he says can save between 30-40% on the cost of landfill and backfill.