Skip to main content

Puddle problem solved

A slip resistant, waterproof surface has solved the puddle problem on a footbridge in the UK. The local council was seeking a solution to the problem of water accumulation on the heavily used Angmering footbridge which extends over the A259. Contractor May Gurney, approached Gaysha Specialist Surfaces, which is a specialist in innovative resin paving products, to undertake the resurfacing work. Gaysha Specialist Surfaces laid 190m2 of Tripave, a durable rapid cure surfacing system based on methyl methacryla
February 13, 2012 Read time: 1 min
A slip resistant, waterproof surface has solved the puddle problem on a footbridge in the UK. The local council was seeking a solution to the problem of water accumulation on the heavily used Angmering footbridge which extends over the A259. Contractor May Gurney, approached 2585 Gaysha Specialist Surfaces, which is a specialist in innovative resin paving products, to undertake the resurfacing work. Gaysha Specialist Surfaces laid 190m2 of Tripave, a durable rapid cure surfacing system based on methyl methacrylate (MMA) resin technology. This product suits duties for pedestrian and traffic applications, particularly where time critical installation is a high priority. The resin surface can be expected to have a useful life of at least 10-25 years according to Gaysha Specialist Surfaces. Using the resin bound method, the aggregate and the resin are mixed together and spread over a prepared base.

For more information on companies in this article

Related Content

  • Scottish application for SMA surfacing technology
    May 20, 2014
    A new Scottish specification for stone mastic asphalt could help with some of the durability issues sometimes experienced in the UK An alternative specification for stone mastic asphalt has been used on the A90 in Scotland, with tests suggesting that the material will be more durable than thin surfacing produced under the standard UK specification, Clause 942 of the Specification for Highway works.
  • G&Z pave the way as East meets West
    March 28, 2014
    The Silk Route is one of the oldest trading links between Europe and Asia and is being upgraded with some of the newest equipment. The nation of Georgia is located on what is known as the ‘crossroads’ between Western Asia and Eastern Europe. It lies to the east of the Black Sea and is on one of the shortest routes between western China and Europe. Since the Middle Ages this strategically important country has played host to one of the network of roads collectively known as the Silk Route. For much of the 20
  • Geosynthetics stabilise differential settlement
    May 3, 2012
    The ongoing Highways Agency A66 Carkin Moor to Scotch Corner project involves upgrading the original single carriageway to address safety concerns, particularly at junctions and crossings. Where differential settlement is threatening a remodelled junction, Tensar International's new TriAx geogrid provides an additional dimension of stability, saving design and build contractors Balfour Beatty Regional Civil Engineering Limited (BBRCEL) the heavy time and costs inherent in conventional remedial solutions and
  • Geosynthetics stabilise differential settlement
    March 14, 2012
    The ongoing Highways Agency A66 Carkin Moor to Scotch Corner project involves upgrading the original single carriageway to address safety concerns, particularly at junctions and crossings. Where differential settlement is threatening a remodelled junction, Tensar International's new TriAx geogrid provides an additional dimension of stability, saving design and build contractors Balfour Beatty Regional Civil Engineering Limited (BBRCEL) the heavy time and costs inherent in conventional remedial solutions and