Skip to main content

Puddle problem solved

A slip resistant, waterproof surface has solved the puddle problem on a footbridge in the UK. The local council was seeking a solution to the problem of water accumulation on the heavily used Angmering footbridge which extends over the A259. Contractor May Gurney, approached Gaysha Specialist Surfaces, which is a specialist in innovative resin paving products, to undertake the resurfacing work. Gaysha Specialist Surfaces laid 190m2 of Tripave, a durable rapid cure surfacing system based on methyl methacryla
February 13, 2012 Read time: 1 min
A slip resistant, waterproof surface has solved the puddle problem on a footbridge in the UK. The local council was seeking a solution to the problem of water accumulation on the heavily used Angmering footbridge which extends over the A259. Contractor May Gurney, approached 2585 Gaysha Specialist Surfaces, which is a specialist in innovative resin paving products, to undertake the resurfacing work. Gaysha Specialist Surfaces laid 190m2 of Tripave, a durable rapid cure surfacing system based on methyl methacrylate (MMA) resin technology. This product suits duties for pedestrian and traffic applications, particularly where time critical installation is a high priority. The resin surface can be expected to have a useful life of at least 10-25 years according to Gaysha Specialist Surfaces. Using the resin bound method, the aggregate and the resin are mixed together and spread over a prepared base.

For more information on companies in this article

Related Content

  • Utah pioneers 15cm thick-lift
    March 9, 2022
    Thick-lift paving could reduce road maintenance costs, as a recent trial in the US state of Utah is showing, reports Kristina Smith.
  • Multiple asphalt plants supply major highway construction
    July 12, 2012
    One company has produced eight asphalt plants for a major project, and others are introducing new models as Patrick Smith reports Algeria's US$11.2 billion East-West Highway development, the world's largest current highway construction project, forms part of the larger Trans-Maghreb Motorway project, and is scheduled for completion in 2010. It will run for 1,216km, ensuring the link between Annaba in the north-east and Tlemcen in the north-west, passing directly through 24 provinces and linking Algeria to T
  • Modified asphalt trials in Brazil
    October 17, 2012
    An urgent need to improve and extend its road network means that Brazil is open to innovation and new ideas - the timing looks good for Kraton and its highly modified asphalt. Kristina Smith reports On 15th August Brazilian president Dilma Rousseff announced a US$66 billion (BRL 133 billion) investment package for the country’s road and rail networks. Of that, $21 billion (BRL 42 billion) is earmarked for the upgrade or construction of 7,500km of highways through a series of concessions. “We’re starting an
  • Stimsonite Click Stud saves on in-situ replacement time
    April 29, 2015
    Over the past four years, there have been nine road worker deaths on the Highways Agency network in the UK. Statistics such as these are drivers for road authorities to improve health and safety for the workforce on the network. It takes just seconds to replace a Stimsonite Click Stud reflector compared to an average time of eight minutes to remove and replace a conventional bonded road stud. This greatly benefits the Highways Agency by reducing the exposure of road workers to traffic. Conventional