Skip to main content

Polish road strengthened by Tensar

Consultants have specified Tensar techology in the rebuilding of a deteriorating Polish highway in order to meet current standards. The use of Tensar geogrids enabled consultants Drotest and Dro-konsult Warsaw to create a stable asphalt pavement quicker and more economically than using conventional construction methods, says Tensar. The 40km long road, which connects Bartoszyce and Ketrzyhn, had exceeded its design life and clearly showed its structural weakness with bad rutting, extensive fatigue crackin
July 31, 2012 Read time: 2 mins
Consultants have specified 340 Tensar techology in the rebuilding of a deteriorating Polish highway in order to meet current standards.

The use of Tensar geogrids enabled consultants 1438 Drotest and Dro-konsult Warsaw to create a stable asphalt pavement quicker and more economically than using conventional construction methods, says Tensar.

The 40km long road, which connects Bartoszyce and Ketrzyhn, had exceeded its design life and clearly showed its structural weakness with bad rutting, extensive fatigue cracking and surface deformation. The 6m wide carriageway was carried on a narrow fill embankment with minimum shoulders and flanked by deep ditches.

Conventional techniques of installing a thick pavement structure to improve the road bearing performance would have required widening the embankment to carry the additional construction. This was an expensive option and not economically possible.

Instead, the Tensar technical design team proposed the installation of a lean concrete base carrying Tensar geogrid composite reinforced asphalt layers. Over the concrete, the contractors PBDiM Minsk Mazowiecki laid a bituminous bond coat, and rolled out the Tensar ARG composite (geogrid bonded to a paving fabric) which was then brushed flat.

Over the concrete road base they laid a new binder course followed by wearing layers of asphalt. The function of the Tensar geogrid composite was to restrict any shrinkage cracking from the concrete layer from reflecting into the asphalt. In addition, its load bearing capability will provide fatigue resistance for the asphalt layers.

For more information on companies in this article

Related Content

  • Evonik’s top marks for Colombian tourist highway solution
    May 15, 2014
    Leading German road marking product manufacturer Evonik Industries has played a key role in improving safety on a popular Colombian tourist highway, as Guy Woodford reports Bearing the name of the memorable peacemaker governor of Antioquia, the Guillermo Gaviria Correa road, located between the Colombian municipalities of Medellin and San Jerónimo, connects Medellin to the Uraba Gulf part of the Caribbean Sea. In operation since 2007, the road, in combination with the Fernando Gómez Martínez tunnel –
  • Rapping with Anova in Phoenix
    February 5, 2021
    A recent test programme in Phoenix involving recycled asphalt pavement and the Anova asphalt rejuvenator from Cargill alerted the US city to environmental and cost savings that it was missing.
  • New developments are pushing the pace of progress in asphalt paving
    January 4, 2013
    New developments will broaden the asphalt paving market - Mike Woof reports. A new approach to materials could help address rising bitumen costs. Increased use of recycled asphalt pavement (RAP) in road construction can cut a major chunk from paving costs, with an array of technologies now available. In the US, RAP is one of the most widely recycled materials and current techniques allow roads built with this material to perform well for all traffic conditions. Some European countries are also making widesp
  • Success of hot mix asphalt road recycling
    March 7, 2012
    Russian construction firm Kamdorstroy has carried out a successful demonstration of recycling techniques to over 60 highway officials, academics and contractors from all over the CIS states. The demonstration was carried out in co-operation with the Russian Federal Highway and Tatarstan Highway authorities and involved milling, recycling and overlaying a road with hot mix asphalt. The work was carried out on a 7.5m wide roadway with 3.8m wide lanes (with an overlap) using machinery and techniques new to Rus