Skip to main content

Polish road strengthened by Tensar

Consultants have specified Tensar techology in the rebuilding of a deteriorating Polish highway in order to meet current standards. The use of Tensar geogrids enabled consultants Drotest and Dro-konsult Warsaw to create a stable asphalt pavement quicker and more economically than using conventional construction methods, says Tensar. The 40km long road, which connects Bartoszyce and Ketrzyhn, had exceeded its design life and clearly showed its structural weakness with bad rutting, extensive fatigue crackin
July 31, 2012 Read time: 2 mins
Consultants have specified 340 Tensar techology in the rebuilding of a deteriorating Polish highway in order to meet current standards.

The use of Tensar geogrids enabled consultants 1438 Drotest and Dro-konsult Warsaw to create a stable asphalt pavement quicker and more economically than using conventional construction methods, says Tensar.

The 40km long road, which connects Bartoszyce and Ketrzyhn, had exceeded its design life and clearly showed its structural weakness with bad rutting, extensive fatigue cracking and surface deformation. The 6m wide carriageway was carried on a narrow fill embankment with minimum shoulders and flanked by deep ditches.

Conventional techniques of installing a thick pavement structure to improve the road bearing performance would have required widening the embankment to carry the additional construction. This was an expensive option and not economically possible.

Instead, the Tensar technical design team proposed the installation of a lean concrete base carrying Tensar geogrid composite reinforced asphalt layers. Over the concrete, the contractors PBDiM Minsk Mazowiecki laid a bituminous bond coat, and rolled out the Tensar ARG composite (geogrid bonded to a paving fabric) which was then brushed flat.

Over the concrete road base they laid a new binder course followed by wearing layers of asphalt. The function of the Tensar geogrid composite was to restrict any shrinkage cracking from the concrete layer from reflecting into the asphalt. In addition, its load bearing capability will provide fatigue resistance for the asphalt layers.

For more information on companies in this article

Related Content

  • Road recycling train from Wirtgen in Nigeria
    March 9, 2022
    The Wirtgen Group has worked with Julius Berger Nigeria (JBN) in Nigeria to deliver a landmark project
  • Fast patch repairs from Hitex
    December 7, 2016
    Hitex International has achieved full BBA certification for its new rapid road repair products. TexPatch and TexBand Solo are fill and over-band products designed to seal and repair potholes, cracks, seams and joints, to prevent further road deterioration. As well as being quick and easy to install, these can handle traffic within minutes to speed up the repair process, minimise disruption and reduce traffic management costs. TexPatch provides a fast, permanent and economical solution to repair potholes
  • The side effect – paving with a road widener
    December 13, 2018
    Sidewinder UK has been using its novel road widener machines on a series of paving jobs, including smart motorway projects. Sidewinder UK has carried out work on the M6 smart motorway contract between junction 16 and junction 19. The company used one of its road wideners to place and grade the final layer of sub-base to the balanced central reservation in readiness for Tarmac Contracting to pave the base and binder courses. An estimated 5,000tonnes of sub-base was used in the initial 6.4km x 4.7m wide st
  • Kraton expands duty range of its polymer products
    August 23, 2013
    The pavement industry needs to come up with novel solutions in order to meet the twin challenges of climate change and squeezed budgets. This was the message from Kraton Polymers market development manager Rombout Hartemink when he addressed FIRM13. Hartemink illustrated the properties of Kraton’s modified bitumen with the aid of his stretchy bar. This 250mm-long bar of Highly Modified Bitumen stretches to five or six times its length, returning to its original state in around five minutes. “It changes