Skip to main content

Pioneering move for Cat paver

Melbourne winters are known as some of the coldest of all state capital cities on Australia's mainland, and its summers can be brutally hot. As a result, roads in the region need to be regularly maintained to ensure safety and promote longevity. Pioneer Road Services, headquartered in Victoria, recently took delivery of the first Cat AP300 asphalt paver to Australia, and it will be the first to play a role in maintaining the city's roads throughout the seasons. With the help of Cat dealer William Adams and
July 16, 2012 Read time: 2 mins
The first Cat AP300 asphalt paver in Australia
Melbourne winters are known as some of the coldest of all state capital cities on Australia's mainland, and its summers can be brutally hot. As a result, roads in the region need to be regularly maintained to ensure safety and promote longevity.
Pioneer Road Services, headquartered in Victoria, recently took delivery of the first Cat AP300 asphalt paver to Australia, and it will be the first to play a role in maintaining the city's roads throughout the seasons.

With the help of Cat dealer William Adams and the 178 Caterpillar commissioning team, Pioneer Road Services put the new paver finisher through its inaugural paces on an important shoulder reconstruction project for an 8km stretch of highway between Pakenham and Drouin, southeast of Melbourne.

According to the paving crew on site, the project was challenging. Traffic control was critical, as the road was busy and space was at a premium. With the project's narrow paving width, machine productivity and manoeuvrability were critical. Pioneer Road Services knew the powerful, yet small, Cat AP300 with electric screed (model AS3173) would fit the bill, as crews raced to resurface the shoulders of the busy highway in preparation for the approaching winter.

Available in both LPG and electric heating systems, the hydraulic power extendable AS3173 screed offers variable frequency tamper or vibrators, and lays material to the desired depth and width. With mechanical extensions added to both sides, its maximum paving width can reach 4m.

For more information on companies in this article

Related Content

  • Granite pilots Volvo’s Compact Assist to new heights in Sacramento
    November 9, 2017
    While not required for its Sacramento Airport contract, Granite Construction* is getting to grips with IC specifications thanks to Volvo CE’s Compact Assist. In the US, 23 states have written intelligent compaction (IC) specifications for asphalt paving jobs and more states are expected to follow. Among those states with IC specs is California.
  • Seal of approval
    August 2, 2012
    Timely maintenance using proven cost-effective methods can extend the life of a highway by many years as Patrick smith reports Highways are expensive assets to construct, and the wear and tear of modern traffic means that regular maintenance will delay costly repairs or in extreme cases reconstruction. There are a number of methods of carrying out such maintenance, and these include the use of slurry seals and micro-surfacing, which are cold mixed asphalt which is a mixture of graded aggregate, asphalt emul
  • US highway rebuild uses hard-wearing asphalt
    July 18, 2012
    Guntert & Zimmerman equipment is being used to create a new hard-wearing asphalt surface on a key Interstate highway in the US state of Kansas as Mike Woof reports A busy Interstate highway in the US is now benefiting from a new, long-lasting surface. The road, Interstate 70 in Western Kansas, was in need of resurfacing. The full-depth asphalt roadway, up to 508mm thick in certain sections, had reached the end of its working life.
  • Kosovo's award-winning green highway construction
    March 20, 2012
    A new highway is proving an economic lifeline for the tiny country of Kosovo – Mike Woof reports. Road projects in Europe rarely meet such widespread public approval and support as the new Route 7 highway being built in the new Balkan state of Kosovo. The first sections of the new road opened to traffic in November 2011, with locals turning out in large numbers to celebrate the event. The official opening was carried out by the country’s prime minister Hashim Thaçi, president Atifete Jahjaga, and members of