Skip to main content

Paving giant in action

The project to build a new orbital motorway to bypass the Spanish city of Barcelona has benefited from the use of the world's largest asphalt paver. This represents one of the first jobs in Europe for the power paver, Vögele's SUPER 3000-2, which was first launched at the Bauma exhibition in Munich in 2010.
February 20, 2012 Read time: 3 mins
The powerful new giant Super 3000-2 paver from Vogele is proving its worth on a road contract in Spain
The project to build a new orbital motorway to bypass the Spanish city of Barcelona has benefited from the use of the world's largest asphalt paver. This represents one of the first jobs in Europe for the power paver, 1194 Vögele's SUPER 3000-2, which was first launched at the 688 Bauma exhibition in Munich in 2010.

The project is an important one for the region and construction of the B-40 orbital motorway was a major project in every respect. With an investment volume of €1.9 billion, the roughly 50km long bypass around the Catalan capital represented one of Spain's most significant infrastructure projects. The highway runs some 25km to the north of Spain's second largest city and connects the cities of Abrera, Terrassa, Granollers and Sant Celoni. The forecast traffic volume for the roughly 50km long route is some 40,000 vehicles/day. Because of the high traffic volumes, the demands on the road structure will be high and specifications and quality standards are equally high.

The contract for the asphalt paving work was awarded to Spanish contractor Pavimentos Barcelona (Pabasa), which transported the machine to the job site immediately after delivery, where its first task awaited it: paving wearing course.

To build the new section near Viladecavalls, Pabasa used the SUPER 3000-2, a paver that is predestined for large-scale projects. The width of the job site varied from

12-18m. The pave width was from 10.5-15.5m, with the wearing course placed in one pass. However the output presented no problems for the SUPER 3000-2, which is designed for high laydown rates and large paving widths. It features a maximum laydown rate of 1,600tonnes/hour and a maximum pave width of 16m. The systems for conveying and spreading the mix, too, are designed for highest performance. Conveyors and augers ensure that the required amount of mix is available in front of the screed, even when operating at the maximum paving speed of 24m/min.

In order to ensure the supply of mix from the feed lorries to the paver, a Vögele MT 1000-1 Mobile Feeder was deployed upstream of the SUPER 3000-2. The feeder received the mix from the lorries and transferred it to the heavy-duty paver via its belt conveyor. Due to non-stop feeding of the paver with mix, paving could proceed without interruptions, making the roadworks cost-effective. Furthermore, the non-contacting transfer of mix from the feeder provides for a particularly high quality of paving.

In order to stay within the touch limits for eveness, the Pabasa team equipped the SUPER 3000-2 with two Vögele Big MultiPlex Skis, one on the right and one on the left side of the machine. The binder course served as a reference. The Big MultiPlex Ski is a sensor system operating with three multi-cell sonic sensors attached to a modular beam ranging from

5-13m in length. An average is calculated from the measured values, transmitted to the machine's system for automated grade and slope control, making corrections when necessary. The system is suited for job sites where long irregularities need to be levelled out and proved once again its suitability for use in highway construction projects.

With an average pave speed of 3-4m/min, the contractor's team achieved a very good paving result, due to the powerful paver as well as the 228 Hamm compaction machines used, two HD 130 tandem rollers and a GRW 18 pneumatic-tyred roller.

For more information on companies in this article

Related Content

  • Premiere in the Black Forest
    October 5, 2023
    One of the steepest sections of the B 500, an important road in the southern Black Forest, had to be renewed in the summer of 2023 – more precisely: the first kilometres behind the Triberg town sign, past the famous waterfalls. Asphalt paving specialists from Gebrüder Bantle GmbH & Co. KG were commissioned to resurface the carriageway.
  • Fast, cost-effective road stabilisation
    February 15, 2012
    The Kivikko industrial area in Finland, which is owned by the City of Helsinki, has expanded gradually over the years and it has expanded again with the new stabilised area now about 3.5hectares. The ALLU equipment and system was used to stabilise Kivikko for the first time in 2001, and the latest job started in June 2010 with the stabilisation work completed by mid-December 2010. [The ALLU Stabilisation System is a Finnish invention that provides a fast, cost-effective and environmental-friendly working
  • Two German autobahns benefit from new Wirtgen concrete slipforming technology
    November 15, 2013
    Two important routes in Germany, the A9 and A6 autobahn highways, have benefited from the use of the latest Wirtgen slipforming machines. The A9 is a particularly important route in Germany as this 529km link connects capital Berlin with the southern city of Munich, running through Brandenburg, Saxony-Anhalt, Saxony, Thuringia and Bavaria.
  • Improvements to China's first desert expressway
    April 4, 2013
    The latest asphalt paving technology is now available and being utilised in novel ways to build and improve roads, often in challenging applications. Tough working environments, strict project deadlines and precise quality requirements are all posing engineering challenges for road construction projects around the world. For a number of asphalt paving applications, novel approaches and new technology are being employed to deliver projects on time and within specifications. In China, improvements to the coun