Skip to main content

Material transfer vehicles for Poland

Roadtec Shuttle buggies are now being used on major road projects in Poland. This follows a decision made by the Polish road authority, GDDKIA, to use material transfer vehicles on highway projects. The need for a smooth running surface is paramount on highways as in Poland these tolled links can allow speed limits of up to 140km/h. This is why GDDKIA decided the use of a material transfer vehicle was crucial to optimising mix delivery into pavers, so as to help optimise surface finish.
April 1, 2014 Read time: 2 mins
Surface finish has been optimised due to the use of material transfer equipment from Roadtec
1252 Roadtec Shuttle buggies are now being used on major road projects in Poland. This follows a decision made by the Polish road authority, GDDKiA, to use material transfer vehicles on highway projects.

The need for a smooth running surface is paramount on highways as in Poland these  tolled links can allow speed limits of up to 140km/h. This is why GDDKiA decided the use of a material transfer vehicle was crucial to optimising mix delivery into pavers, so as to help optimise surface finish.

However, GDDKiA may start to apply similar requirements to some toll-free express roads that have speed limits of up to 120km/h. The response from GDDKiA has been favourable with regard to the quality, with one project seeing 12km of binder being laid in one in one week, using an 11m wide screed paving a 150mm thickness.

Poland’s 1250 Astec Road Machinery dealer, Road Construction Technology, has already supplied a number of Shuttle Buggies to contractors in the country, including Salini, Impreglio and PBDIM Kobylarnia. The first machine supplied was initially driven by Astec's operator who provided operational and maintenance training for the customer's staff, with a second machine being delivered one week later. Shuttle Buggies were also used on a 63km stretch of the key A1 highway project for four months. Contractor Kobylarnia used the machines on the A1 at Ciechocinek, with material supplied by an Ammann plant located about 45 km from the site and able to produce some 3,000tonnes/day. The mix was delivered using 25tonne capacity semi-trailers.

Paving was carried out by an ABG/2394 Volvo Titan 8820 featuring a fixed screed and two hydraulic extensions to lay down the base course, binder and wearing courses to a width of 11.5m.

Remixing the asphalt and feeding the paver through the Shuttle Buggy helped deliver a homogeneous material and allowed continuous paving through each shift. The use of a material transfer vehicle also reduced the number of trucks needed and the turnaround time to the mixing plant and back to the job site. The two Roadtec machines also benefit from automatic cleaning systems, which helps reduce maintenance needs.

For more information on companies in this article

Related Content

  • Asphalt plant innovations coming to the market
    April 20, 2018
    The use of recycled materials continues to be a key issue for asphalt plant development, but other advances are also being introduced to meet market needs - Mike Woof writes The asphalt plant market has been a focus for a series of technical developments in recent years. Warm asphalt solutions and new technology for the use of recycled asphalt have been high on the R&D priority list for manufacturers of both continuous and batching type plants. However, new developing technology is not the only driver f
  • Volvo ABG6870 paver delivers
    April 11, 2013
    Ashmac Construction Ltd of Northampton in central England has taken delivery of a Volvo ABG 6870 wheeled paver following successful trials and valued third party references. “It has proven over numerous sites since taking ownership that we have made the correct choice,” said company director Greg Emonds. “The crew who are with this particular paver love its performance, manoeuvrability and the ease in which they can operate it – whether it’s in the daytime or at night using the xenon working lights. This is
  • Smarter paving for Berlin ring road
    December 13, 2018
    Germany’s capital Berlin is now benefiting from a newly widened ring road, which will help reduce peak time congestion Much of the work has been carried out by local contractor Johann Bunte Bauunternehmung, which has helped to widen the Berlin ring road from six to eight lanes. The firm has made extensive use of sophisticated paving controls also on its Vögele machines, the AutoSet Plus automatic functions. And the firm claims that these tools have made the work easier for the paving team to move between t
  • Producing recycled materials at an airport for surface use
    October 1, 2018
    Recycling of materials has been carried out at Cologne/Bonn Airport in a move to boost efficiency Using the Wirtgen KMA 220 mobile cold recycling mixing plant allows road construction materials to be recycled or upgraded onsite and avoids the need for numerous transport trips. The system is also economical, as became clear from a job at Cologne/Bonn airport at the end of 2017. There the plant, located immediately next to the job site, produced around 11,000tonnes of materials for a hydraulically bound ba