Skip to main content

Material transfer vehicles for Poland

Roadtec Shuttle buggies are now being used on major road projects in Poland. This follows a decision made by the Polish road authority, GDDKIA, to use material transfer vehicles on highway projects. The need for a smooth running surface is paramount on highways as in Poland these tolled links can allow speed limits of up to 140km/h. This is why GDDKIA decided the use of a material transfer vehicle was crucial to optimising mix delivery into pavers, so as to help optimise surface finish.
April 1, 2014 Read time: 2 mins
Surface finish has been optimised due to the use of material transfer equipment from Roadtec
1252 Roadtec Shuttle buggies are now being used on major road projects in Poland. This follows a decision made by the Polish road authority, GDDKiA, to use material transfer vehicles on highway projects.

The need for a smooth running surface is paramount on highways as in Poland these  tolled links can allow speed limits of up to 140km/h. This is why GDDKiA decided the use of a material transfer vehicle was crucial to optimising mix delivery into pavers, so as to help optimise surface finish.

However, GDDKiA may start to apply similar requirements to some toll-free express roads that have speed limits of up to 120km/h. The response from GDDKiA has been favourable with regard to the quality, with one project seeing 12km of binder being laid in one in one week, using an 11m wide screed paving a 150mm thickness.

Poland’s 1250 Astec Road Machinery dealer, Road Construction Technology, has already supplied a number of Shuttle Buggies to contractors in the country, including Salini, Impreglio and PBDIM Kobylarnia. The first machine supplied was initially driven by Astec's operator who provided operational and maintenance training for the customer's staff, with a second machine being delivered one week later. Shuttle Buggies were also used on a 63km stretch of the key A1 highway project for four months. Contractor Kobylarnia used the machines on the A1 at Ciechocinek, with material supplied by an Ammann plant located about 45 km from the site and able to produce some 3,000tonnes/day. The mix was delivered using 25tonne capacity semi-trailers.

Paving was carried out by an ABG/2394 Volvo Titan 8820 featuring a fixed screed and two hydraulic extensions to lay down the base course, binder and wearing courses to a width of 11.5m.

Remixing the asphalt and feeding the paver through the Shuttle Buggy helped deliver a homogeneous material and allowed continuous paving through each shift. The use of a material transfer vehicle also reduced the number of trucks needed and the turnaround time to the mixing plant and back to the job site. The two Roadtec machines also benefit from automatic cleaning systems, which helps reduce maintenance needs.

For more information on companies in this article

Related Content

  • Paving giant in action
    February 20, 2012
    The project to build a new orbital motorway to bypass the Spanish city of Barcelona has benefited from the use of the world's largest asphalt paver. This represents one of the first jobs in Europe for the power paver, Vögele's SUPER 3000-2, which was first launched at the Bauma exhibition in Munich in 2010.
  • Asphalt paving innovations coming to market
    May 24, 2019
    Asphalt paver manufacturers are introducing new models, many of which are aimed at specific market needs – Mike Woof writes A range of new asphalt paver models are coming to market, with some having been developed specifically for certain markets. China’s demand for construction equipment has resulted in numerous firms developing machines just for this market for example. Customers in China have long favoured the European-style machines, featuring tamper bar screeds, over the machines with vibrating
  • Novel concrete paving method used in Germany
    January 25, 2017
    A novel dual-layer concrete paving technique has been used on jobsites in Germany on the country’s high-speed Autobahn network This technique allows the construction of a strong and durable roadway structure able to cope with heavy traffic loads and offer a long working life. In four German states, Wirtgen SP-1500 slipformers have been employed by four different contractors to carry out dual-layer paving. The method allows a noise-reducing, non-skid exposed aggregate surface to be placed over a bottom
  • Asphalt paving review for 2019
    February 12, 2020
    A series of new asphalt pavers have been introduced in 2019