Skip to main content

Key Heathrow Airport link road undergoes repair

Hounslow Highways, working together with other Eurovia UK divisions including Surfacing, Contracting, Specialist Treatments and Euromark, has completed road reconstruction works on Stanwell Road West - one of the London Borough of Hounslow’s main link roads to Heathrow Airport. A large number of heavy goods vehicles and buses using the 80km/h dual carriageway results in significant loading on the road. Initial plans were to give Stanwell Road West complete reconstruction from the foundation level upwards
October 1, 2014 Read time: 2 mins
Effective planning ensured a major road link to Heathrow Airport was repaired quickly and efficiently
Hounslow Highways, working together with other 3281 Eurovia UK divisions including Surfacing, Contracting, Specialist Treatments and Euromark, has completed road reconstruction works on Stanwell Road West - one of the London Borough of Hounslow’s main link roads to Heathrow Airport.

A large number of heavy goods vehicles and buses using the 80km/h dual carriageway results in significant loading on the road. Initial plans were to give Stanwell Road West complete reconstruction from the foundation level upwards due to rutting and reflective cracking. However extensive tests carried out in collaboration with Test Consult and 2374 Jean Lefebvre UK revealed that there were no issues with the concrete carriageway base.

A new solution was designed by Jean Lefebvre UK to treat cracks and joints in the concrete and allow for Flexiplast to be applied on top of a regulating course prior to the installation of new asphalt layers.

The works were not without challenges. With a high pressure fuel line for the airport crossing the road, advanced line searches and meetings with BPA (British Pipeline Authority) technicians were required to allow the work to be carried out safely. And as Flexiplast has to be laid in dry weather, it was necessary to ensure the timings for each stage of the works were exactly right.

Crew flexibility was also tested when a collapsed sewer in nearby Hatton Road created a diversion route along Stanwell Road West. A different diversion had to be arranged and was managed by taking out a traffic island and a streetlight on Hatton Road.

For more information on companies in this article

Related Content

  • Milling and paving for a highway repair in Oklahoma
    April 5, 2017
    Milling and paving work has helped restore the road surface on an important stretch of highway in the US state of Oklahoma. US Highway 62 is a key route, running 3,597km from to Niagara Falls, New York, at the Canada–US border to the Mexico-US border at El Paso in Texas. It is the only east-west United States numbered highway that connects Canada with Mexico through the US, making it a key transport route. A 12km section of US 62 where it runs through Oklahoma recently benefited from a much-needed rebuild,
  • How waste plastic and soybean oil are helping our roads last longer
    April 13, 2018
    A new super-modifier is born from waste plastic in Italy and a soybean-based rejuvenator from the US spreads from its home market. By Kristina Smith The two bitumen technologies featured this month come from almost opposing sources. One emerges from the human-created plastic waste plaguing our planet, the other from a plant. However, both technologies have been created with the same aims: to increase the life of roads, saving cost and ultimately reducing the impact of road building on the planet. A coll
  • Recycling advances from Wirtgen
    June 18, 2012
    German firm Wirtgen is retaining its lead in road recycling technologies – Mike Woof writes Tests on cold recycling with a new layer thickness using Wirtgen's sophisticated WR 4200 machine have shown impressive results according to the firm. The road construction and traffic authority Landesbetrieb Mobilität (LBM) Cochem-Koblenz commissioned a pilot project as part of its plan to optimise the cold in-place recycling process (CIR). The aim was to examine the extent to which the layer thickness can be reduced
  • Hot-to-hot paving upgrades Bremen City Airport runway
    September 30, 2013
    A new high quality runway surface has been laid at Bremen City Airport. This has provided a much-needed replacement at the airport as the old runway was laid over 20 years ago and was suffering from cracking and potholes. Laying the new surface required the airport to be closed, with the work having to be carried out in a tight time schedule. Contractor Heitkamp Erd- und Straßenbau was brought in to carry out the work as the firm had experience in runway rehabilitation projects having carried out pavemen