Skip to main content

Key Heathrow Airport link road undergoes repair

Hounslow Highways, working together with other Eurovia UK divisions including Surfacing, Contracting, Specialist Treatments and Euromark, has completed road reconstruction works on Stanwell Road West - one of the London Borough of Hounslow’s main link roads to Heathrow Airport. A large number of heavy goods vehicles and buses using the 80km/h dual carriageway results in significant loading on the road. Initial plans were to give Stanwell Road West complete reconstruction from the foundation level upwards
October 1, 2014 Read time: 2 mins
Effective planning ensured a major road link to Heathrow Airport was repaired quickly and efficiently
Hounslow Highways, working together with other 3281 Eurovia UK divisions including Surfacing, Contracting, Specialist Treatments and Euromark, has completed road reconstruction works on Stanwell Road West - one of the London Borough of Hounslow’s main link roads to Heathrow Airport.

A large number of heavy goods vehicles and buses using the 80km/h dual carriageway results in significant loading on the road. Initial plans were to give Stanwell Road West complete reconstruction from the foundation level upwards due to rutting and reflective cracking. However extensive tests carried out in collaboration with Test Consult and 2374 Jean Lefebvre UK revealed that there were no issues with the concrete carriageway base.

A new solution was designed by Jean Lefebvre UK to treat cracks and joints in the concrete and allow for Flexiplast to be applied on top of a regulating course prior to the installation of new asphalt layers.

The works were not without challenges. With a high pressure fuel line for the airport crossing the road, advanced line searches and meetings with BPA (British Pipeline Authority) technicians were required to allow the work to be carried out safely. And as Flexiplast has to be laid in dry weather, it was necessary to ensure the timings for each stage of the works were exactly right.

Crew flexibility was also tested when a collapsed sewer in nearby Hatton Road created a diversion route along Stanwell Road West. A different diversion had to be arranged and was managed by taking out a traffic island and a streetlight on Hatton Road.

For more information on companies in this article

Related Content

  • Cost-effective cold mix asphalt recycling
    February 17, 2012
    In Lithuania, cold mix asphalt containing recycled asphalt pavement has been installed in a new base course overlay for a section of the A1, the country's most heavily trafficked motorway.
  • Innovative formwork beats bridge design challenges
    February 14, 2012
    Companies are coming up with innovative formwork solutions to overcome "challenging" designs for bridges. Patrick Smith reports
  • Well structured maintenance
    January 4, 2013
    Major bridge maintenance and replacement projects across the world are extending the life of many impressive historic landmarks as Guy Woodford reports The Tamar Bridge, part of the main A38 trunk road linking Saltash in Cornwall with Plymouth in Devon, south west England, marked its 50th anniversary with a steel deck resurfacing project involving Stirling Lloyd's Eliminator bridge deck waterproofing system. Jointly owned by Plymouth City Council and Cornwall Council, the Tamar has a suspended length of 642
  • Germany builds its first major PPI autobahn project
    July 7, 2015
    Rebuilding of one of the oldest motorways in Germany is testing out the possibilities for public-private project road construction reports Adrian Greeman A freshly renovated section of the A8 Autobahn in southern Germany will be watched with some interest this summer as traffic begins driving along its rebuilt carriageway and additional third lanes. That is not because of any special road features, other than a distinctive reddish colour to its concrete surface, but because it is a first fullscale public