Skip to main content

Infrared asphalt repair speeds pothole repairs

Improved infrared asphalt repair technology is speeding pothole repairs in applications in North America.
April 4, 2012 Read time: 2 mins
Faster and more durable patch repairs are being achieved using equipment from Kasi Infrared
Improved infrared asphalt repair technology is speeding pothole repairs in applications in North America.

Specialist 2428 Kasi Infrared has had numerous successes with local authorities which use the equipment to deliver seamless infrared asphalt repairs in less than 20 minutes. This method is said to be achieved at a fraction of the cost for conventional remove and replace techniques. Asphalt Technology, a California-based company is using the Kasi equipment to deal with failures caused by water intrusion. Using the equipment makes considerable savings over conventional remove and replace methods. Asphalt Technology opted for a new upgraded infrared asphalt repair option from Kasi. The infrared chamber upgrade enables seamless asphalt repair in under 20 minutes and doubles infrared chamber longevity to over 10 years. A key feature is a new, deeper 8 converter chamber which allows more asphalt to be heated faster, deeper, and more evenly. The contractor transports the equipment in Kasi’s Minute Man trailer-mounted system, which has an asphalt reclaimer to keeps the material at plant mix temperature. Unlike traditional saw, cut, and remove or crack filler repair techniques, Kasi’s infrared system leaves no seams for water and ice to penetrate and patches should last twice as long. The infrared repair’s continuous surface also eliminates the need for tack-coating the edges, boosts durability, and allows roads to be opened to traffic immediately. Lab studies show there is no change in asphalt integrity from the use of its infrared equipment according to Kasi.

For more information on companies in this article

Related Content

  • Technology to ensure continuity and quality for asphalt production
    June 4, 2019
    A variety of complex factors are involved in the production of hot asphalt mixes, with the process vulnerable to sudden stoppages of the equipment. The problems caused by a need for unplanned maintenance are high, as the cost of a plant stoppage is high. In order to minimise disruptions to production, new technologies can be used for wear components. Electronic monitoring of asphalt plant motors during production can boost efficiency, replacing corrective maintenance with preventive and predictive maintenan
  • Recycled porous asphalt trial in Netherlands
    May 15, 2017
    An innovative reuse of porous asphalt is being tested on secondary roads in the Netherlands. The promising LE2AP European Life demonstration project involves test sections of durable, silent asphalt on roads in the Netherlands. LE2AP stands for Low Emission 2 Asphalt Pavement, with the 2 indicating reduced emissions for both CO2 and sound. BAM recently installed two test sections of a novel surface material in collaboration with the Dutch provinces of Noord-Brabant and Gelderland. This asphalt road surface
  • Recycled porous asphalt trial in Netherlands
    May 15, 2017
    An innovative reuse of porous asphalt is being tested on secondary roads in the Netherlands. The promising LE2AP European Life demonstration project involves test sections of durable, silent asphalt on roads in the Netherlands. LE2AP stands for Low Emission 2 Asphalt Pavement, with the 2 indicating reduced emissions for both CO2 and sound. BAM recently installed two test sections of a novel surface material in collaboration with the Dutch provinces of Noord-Brabant and Gelderland. This asphalt road surface
  • Microsurfacing a cost-effective road rehabilitation solution
    July 13, 2012
    German company WEIRO has helped to introduce new microsurfacing technology to Estonia to upgrade its roads Estonia's rapidly growing road network requires modern and cost effective road surface rehabilitation technologies. As a result of technological and economical evaluations of the Estonian road network, it has been stated that repairs and upgrading of the existing network will remain the first priority, especially the repair of ruts, which represent a major problem in Estonia. The aim of a trial run of