Skip to main content

Infrared asphalt repair speeds pothole repairs

Improved infrared asphalt repair technology is speeding pothole repairs in applications in North America.
April 4, 2012 Read time: 2 mins
Faster and more durable patch repairs are being achieved using equipment from Kasi Infrared
Improved infrared asphalt repair technology is speeding pothole repairs in applications in North America.

Specialist 2428 Kasi Infrared has had numerous successes with local authorities which use the equipment to deliver seamless infrared asphalt repairs in less than 20 minutes. This method is said to be achieved at a fraction of the cost for conventional remove and replace techniques. Asphalt Technology, a California-based company is using the Kasi equipment to deal with failures caused by water intrusion. Using the equipment makes considerable savings over conventional remove and replace methods. Asphalt Technology opted for a new upgraded infrared asphalt repair option from Kasi. The infrared chamber upgrade enables seamless asphalt repair in under 20 minutes and doubles infrared chamber longevity to over 10 years. A key feature is a new, deeper 8 converter chamber which allows more asphalt to be heated faster, deeper, and more evenly. The contractor transports the equipment in Kasi’s Minute Man trailer-mounted system, which has an asphalt reclaimer to keeps the material at plant mix temperature. Unlike traditional saw, cut, and remove or crack filler repair techniques, Kasi’s infrared system leaves no seams for water and ice to penetrate and patches should last twice as long. The infrared repair’s continuous surface also eliminates the need for tack-coating the edges, boosts durability, and allows roads to be opened to traffic immediately. Lab studies show there is no change in asphalt integrity from the use of its infrared equipment according to Kasi.

For more information on companies in this article

Related Content

  • Fast road checking
    February 7, 2012
    A sophisticated package for evaluating road condition is now available called e-Spott, from Pipe Hawk. This system is said to be a fast and reliable method of measuring the total bound layer thickness of asphalt laid in a highway reinstatement.
  • Steel sealed on Stonecutters Bridge
    February 6, 2012
    The stone mastic asphalt surface being laid on the bridge deck. The Stonecutters Bridge in Hong Kong, the second longest spanning cable stayed bridge in the world, is a dual three-lane crossing of the Rambler Channel. It utilises 33,500tonnes of structural steel in the bridge deck; 32,000m3 of concrete in the towers and 65 steel deck units relying on 224 cables. Effectively protecting the megastructure's deck from the weather extremes (monsoon rains and extreme heat in the summer) and the high levels of tra
  • Tack Film joins GlasGrid systems
    February 9, 2012
    GlasGrid Tack Film, a "ground-breaking" new product, has been added to the GlasGrid's pavement reinforcement systems. According to Saint-Gobain Technical Fabrics (SGTF), which has developed the new geosynthetic material, it contains a patent-pending, highly engineered film that is designed to eliminate the need for traditional tack coat altogether.
  • Cold recycling in Monsanto, Portugal
    November 24, 2021
    A key machine used for the cold recycling train was the new Wirtgen W 380 CR, which made its debut for Pragosa on this construction site.