Skip to main content

Indian highway construction project

Ammann ARS 121 Soil Compactors have been used for a high-profile roadbuilding project in India.
April 6, 2020 Read time: 1 min
Fuel efficiency and ease of control for the Ammann compactors have helped the operators achieve good results on the Indian highway project

The machines have been carrying out soil compaction for a key section of the 354km Purvanchal Expressway, India’s longest road construction project. The soil work is being completed by Ms Regal Enterprises, a subcontractor of Ms GR Infra.

Machine comfort has helped the operators remain productive throughout long shifts, while high vibration performance has allowed work to be completed in fewer passes. The compactors were successful in the application so Ammann has since delivered additional units.

Once completed, the Purvanchal Expressway will provide easy access to the national capital of New Delhi via the 302km Lucknow-Agra Expressway and the 165km Agra-Greater Noida Yamuna Expressway. In addition, the Purvanchal Expressway will provide uninterrupted connectivity to nine districts: Lucknow, Ghazipur, Amethi, Azamgarh, Faizabad, Barabanki, Mau, Ambedkar Nagar and Sultanpur.

For more information on companies in this article

Related Content

  • A new Indian cable-stayed bridge will improve transport connections
    March 2, 2015
    A major new cable-stayed bridge is being constructed in India - Partha Bratim Basistha reports. In India the construction of a major cable-stayed bridge is underway that will boost connections from capital Delhi to its surrounding areas. The bridge is being built in a bid to ease growing interstate traffic movement between Delhi and the surrounding North Indian states of Punjab, Uttar Pradesh, Haryana and Himachal Pradesh. Named Signature Bridge, this is a landmark structure due to its design aesthetics and
  • $3.1 billion Delhi roads upgrade
    August 4, 2025
    India’s capital Delhi is to benefit from $3.1 billion of road improvements.
  • Airport preparation through compaction
    April 12, 2018
    Two major airport projects around the world are being constructed on poor ground and have required extensive compaction - Mike Woof writes With air travel continuing to increase around the world, airport capacity is being upgraded in many major cities. Two of the world’s largest mega cities, Beijing and Istanbul, are constructing new airports to cope with growing demand. This is because the existing facilities are simply unable to cope with projected growth for aviation and some of the airports are alrea
  • Investing in compaction machine innovation
    March 14, 2012
    The Wirtgen Group is developing its manufacturing facilities outside of Germany. The company has extensive operations in Brazil and China and has now opened a new plant in India, which has started production already. Joint president Stefan Wirtgen said, “The first machine we made was a Hamm compactor. It is specially developed for the Indian market.”