Skip to main content

Indian highway construction project

Ammann ARS 121 Soil Compactors have been used for a high-profile roadbuilding project in India.
April 6, 2020 Read time: 1 min
Fuel efficiency and ease of control for the Ammann compactors have helped the operators achieve good results on the Indian highway project

The machines have been carrying out soil compaction for a key section of the 354km Purvanchal Expressway, India’s longest road construction project. The soil work is being completed by Ms Regal Enterprises, a subcontractor of Ms GR Infra.

Machine comfort has helped the operators remain productive throughout long shifts, while high vibration performance has allowed work to be completed in fewer passes. The compactors were successful in the application so Ammann has since delivered additional units.

Once completed, the Purvanchal Expressway will provide easy access to the national capital of New Delhi via the 302km Lucknow-Agra Expressway and the 165km Agra-Greater Noida Yamuna Expressway. In addition, the Purvanchal Expressway will provide uninterrupted connectivity to nine districts: Lucknow, Ghazipur, Amethi, Azamgarh, Faizabad, Barabanki, Mau, Ambedkar Nagar and Sultanpur.

For more information on companies in this article

Related Content

  • A new asphalt plant in Cameroon
    January 27, 2023
    A Lintec CSM4000 containerised asphalt plant in Cameroon has helped with the construction of the country’s first-ever expressway linking its two largest cities, Douala and Yaoundé. The new route replaces an older roadway in use for over three decades that no longer met traffic needs.
  • The future of autonomy
    January 13, 2023
    The panel of experts from Trimble and Dynapac discussed where the construction industry is on the path to autonomy at present, where it is heading, and Trimble’s overall corporate vision for the future. Trimble’s philosophy is that machine autonomy is about more than just controlling the machine. To move the industry forward, autonomy solutions must also turn real-time data into real-time information to optimise and coordinate the jobsite of the future according to Trimble. Providing full access to that data presents a challenge, but can be achieved.
  • IRB wins India’s Agra-Etawah Bypass project on National Highway 2
    June 4, 2015
    IRB Infrastructure Developers has won the Agra-Etawah Bypass project with a winning bid of nearly US$416.5 million, Indian media reported. The project, awarded by the National Highways Authority of India (NHAI), will have six lanes built onto the Agra-Etawah Bypass in Uttar Pradesh state under NHDP Phase 5 of the Build-Operate-Transfer (BOT) Toll model. The 15km Agra-Etawah Bypass runs between the Uttar Pradesh cities of Agra - home to the iconic Taj Mahal mausoleum – and Etawah on the banks of Yamuna
  • Airport's high demands on asphalt and concrete techniques
    July 11, 2012
    Airport runway, taxiway and parking areas make high demands on paving requirements, both with concrete and asphalt techniques. Mike Woof reports. High quality surface finishes are required in airport environments for runways, taxiways and aircraft parking areas. Because of the speed at which aircraft take off and land and the massive forces exerted due to the weight of the aircraft, particularly during landing, runway structures need to be incredibly strong. The surfaces also have to be constructed to very