Skip to main content

Increased milling productivity

Using a wider milling drum on certain applications has allowed an Italian contractor to boost productivity.
February 6, 2012 Read time: 3 mins
By using a wide drum on its Cat PM200 planer, an Italian contractor has got the most out of its equipment on a project to repair a section of the E78 highway
Using a wider milling drum on certain applications has allowed an Italian contractor to boost productivity. Arezzo-based 2295 Gellini Costruzioni recently found that using a 2.2m wide drum on its 2294 CAT PM200 cold planer instead of the standard width of 2m increased milling rate significantly. The firm said that it was able to complete a job in four passes, instead of five. This saved time and fuel as the PM200's engine has plenty of power to drive the wider drum according to the firm.

The machine has been used on the highway E78 Due Mari project, which connects the Tyrrhenian and Adriatic seas. The road also connects the key cities of Grosseto, the chief town of Tuscany's coastal area, and Fano, a coastal resort in the Marche region.

Gellini tested its new wide drum on a portion of E78 in the Tuscany province of Arezzo. The 8.35m wide road featured a driving lane and a passing lane and problems in the sub-base meant the road had to be rebuilt.

Plans called for milling, recycling and placing new asphalt over a 1.1km stretch and the PM200 cut at a depth of 230mm in the driving lane, and 50mm in the passing lane. The crews used cold recycling techniques to rebuild the sub-base, with a Cat AP600 paver then being used to lay a 50mm binder course, followed by a 50mm wearing course and a Cat CB434 compacting the mat.

Despite its wide drum, the PM200 was able to work at the same pace as with its standard drum. Breakout size was about 30mm and the milled material was conveyed into trucks. A portion of the milled material was hauled to Gellini's plant for recycling at a later date, while a greater percentage was temporarily stored on site and then used in the cold recycling process.

The rotor and Boart teeth performed well according to the contractor, which also commented on the easy operation of the PM200 that allowed the grade and slope controls to be set in position. The other PM200 components and systems performed well despite the wider drum, with the water spray devices limiting the dust and helping keep the bits cool while the conveyors handled the increased loads.

The contractor tested the drum in the field and the cold planer was taken into the shop, and the standard 2m drum was replaced with the 2.2m version. The first test was milling a 2.3km long section on the Firenze-Siena highway at a depth of 230mm. The work took a total of a week and the wider drum improved productivity and reduced fuel consumption without additional cost. Gellini Costruzioni is now milling the E45 highway at Cesena in Northern Italy, again using the wide drum to maximise output.

For more information on companies in this article

Related Content

  • Efficient milling and re-paving on historic Florence streets
    February 1, 2013
    Maintenance of roads in historic districts is a challenge for communities around the world. The sanctity of the surroundings limits the amount of re-engineering and widening that can be considered. Improvement options typically are limited to repairs. Yet repairs also have an impact. The historic areas usually attract tourists and their crucial economic contributions. If the street repairs create too much of an inconvenience, tourists are likely to avoid the area and a negative economic impact and a loss of
  • Road repairs fuel demand for milling machines
    February 13, 2012
    A need for road repairs is fuelling demand for new milling machines, Mike Woof reports. With many roads in Europe and North America needing repairs, manufacturers continue to meet demand by offering improved compact milling machines, as well as full-sized planers. The versatile and manoeuvrable compact machines can play a useful role in on-site recycling jobs for urban road improvements while the larger mills can be vital for in-situ recycling work.
  • Historic Oakland Bay Bridge receives a new asphalt road surface
    March 31, 2014
    Part of an iconic US bridge has been given a new lease of life, as Mike Woof reports The western section of the historic Oakland Bay Bridge in the US state of California has recently benefited from a series of improvements to strengthen its structural integrity and also upgrade the running surface. Contractor OC Jones & Sons of Berkeley CA, paved large portions of the bridge, taking on two different projects as part of the work. First was placement of the specialised epoxy on the self-anchored suspension (S
  • Recycling used for German road expansion project
    April 20, 2018
    A milling machine from Bomag has been carrying out an important portion of the work needed for a four-lane expansion of a busy route in Southern Germany Widening work has been carried out on the B85 route from Amberg to Pittersberg in Bavaria to boost its capacity. The 2.6km section was prioritised as being in urgent need of improvement by the Federal transport Ministry. Construction work commenced in mid-2017, starting with preparation works and the project includes a cloverleaf interchange to connect t