Skip to main content

Increased milling productivity

Using a wider milling drum on certain applications has allowed an Italian contractor to boost productivity.
February 6, 2012 Read time: 3 mins
By using a wide drum on its Cat PM200 planer, an Italian contractor has got the most out of its equipment on a project to repair a section of the E78 highway
Using a wider milling drum on certain applications has allowed an Italian contractor to boost productivity. Arezzo-based 2295 Gellini Costruzioni recently found that using a 2.2m wide drum on its 2294 CAT PM200 cold planer instead of the standard width of 2m increased milling rate significantly. The firm said that it was able to complete a job in four passes, instead of five. This saved time and fuel as the PM200's engine has plenty of power to drive the wider drum according to the firm.

The machine has been used on the highway E78 Due Mari project, which connects the Tyrrhenian and Adriatic seas. The road also connects the key cities of Grosseto, the chief town of Tuscany's coastal area, and Fano, a coastal resort in the Marche region.

Gellini tested its new wide drum on a portion of E78 in the Tuscany province of Arezzo. The 8.35m wide road featured a driving lane and a passing lane and problems in the sub-base meant the road had to be rebuilt.

Plans called for milling, recycling and placing new asphalt over a 1.1km stretch and the PM200 cut at a depth of 230mm in the driving lane, and 50mm in the passing lane. The crews used cold recycling techniques to rebuild the sub-base, with a Cat AP600 paver then being used to lay a 50mm binder course, followed by a 50mm wearing course and a Cat CB434 compacting the mat.

Despite its wide drum, the PM200 was able to work at the same pace as with its standard drum. Breakout size was about 30mm and the milled material was conveyed into trucks. A portion of the milled material was hauled to Gellini's plant for recycling at a later date, while a greater percentage was temporarily stored on site and then used in the cold recycling process.

The rotor and Boart teeth performed well according to the contractor, which also commented on the easy operation of the PM200 that allowed the grade and slope controls to be set in position. The other PM200 components and systems performed well despite the wider drum, with the water spray devices limiting the dust and helping keep the bits cool while the conveyors handled the increased loads.

The contractor tested the drum in the field and the cold planer was taken into the shop, and the standard 2m drum was replaced with the 2.2m version. The first test was milling a 2.3km long section on the Firenze-Siena highway at a depth of 230mm. The work took a total of a week and the wider drum improved productivity and reduced fuel consumption without additional cost. Gellini Costruzioni is now milling the E45 highway at Cesena in Northern Italy, again using the wide drum to maximise output.

For more information on companies in this article

Related Content

  • Test track milling with Roadtec
    September 11, 2018
    A milling machine from Roadtec has carried out important work at the National Centre for Asphalt Technology (NCAT) test track in the US. The 2.7km NCAT test track is used for asphalt pavement testing and research. As the facility is important to the advancement of asphalt technologies, Roadtec donates its time, equipment and personnel to carrying out rehabilitation work at the test track. An RX900E model was donated by Roadtec to NCAT and was used by David Bussard and Charlie Butler to mill to depths from
  • Wide work for a Simex PL 2000 in Florence
    August 1, 2023
    According to Simex, its 2m-wide PL 2000 is the widest asphalt cold planer for skid steer loaders.
  • Cutting to the chase – with milling tools
    May 16, 2016
    Powerscreen is celebrating 50 years in business this year, and it will launch celebrations at the Hillhead (28-30 June, Buxton, England). Colin Clements, global product line director said: “Powerscreen have been providing the crushing and screening industry with high quality, innovative products for 50 years and we are excited to celebrate that success with those who matter - our distributors and customers. By kicking off the celebrations at Hillhead, we will be able to showcase new and revamped equipmen
  • Germany’s B-85 gets the treatment from Bomag’s BM 2200/75 planer
    February 23, 2018
    By this spring, Bomag’s new BM 2200/75 cold planer will have removed all the old pavement from a 2.6km section of Germany’s federal highway B-85. Work on the section between Amberg and Pittersberg started at the end of 2016 after the Ministry of Transport classified the road as being in “urgent need” of upgrading as part of the Federal Transport Infrastructure Plan. Actual roadworks began in mid-June 2017 after essential forestry work had been carried out, such as the removal of tree roots on both sides