Skip to main content

Hydrodemolition for repairing airport runways

Hydrodemolition is being used for repairing airport runways, making the process faster and improving quality. According to Aquajet Systems, its high-pressure water jets can be used for the controlled removal or scarification of concrete, as well as the removal of paint and rubber, leaving a fresh surface. The Aqua Cutter hydrodemolition robots are said to be highly efficient when working on concrete runway surfaces. The operator controls the high-pressured ceramic nozzles from a distance, adjusting the s
October 1, 2018 Read time: 2 mins
The Aquajet Rotolance attachment can be paired with a hydrodemolition robot to remove a thin layer of concrete
Hydrodemolition is being used for repairing airport runways, making the process faster and improving quality.

According to 2784 Aquajet Systems, its high-pressure water jets can be used for the controlled removal or scarification of concrete, as well as the removal of paint and rubber, leaving a fresh surface.

The Aqua Cutter hydrodemolition robots are said to be highly efficient when working on concrete runway surfaces. The operator controls the high-pressured ceramic nozzles from a distance, adjusting the stroke to control the depth of cuts and vary the pressure of the water jet. The process allows operators to remove just the top layer of concrete or remove the slab in its entirety. During hydrodemolition, the rebar is cleaned and descaled.

Aside from removing the concrete, Aquajet’s Rotolance attachment is used by maintenance crews to remove paint and rubber from the airstrip. The Rotolance uses its high-pressure water jets to roughen the top layer of concrete to provide a better bonding surface. The tool provides water pressure up to 2,500bar and also removes the rubber left by aircraft tyres.

For more information on companies in this article

Related Content

  • A new runway surface for a major airport in Indonesia
    August 12, 2020
    Major rebuilding work has been carried out at Minangkabau International Airport (PDG), while the New Yogyakarta International Airport (NYIA) has been built in Indonesia.
  • Kuwait’s key causeway contract under construction
    July 4, 2016
    A new causeway, crossing the Bay of Kuwait, is under construction and providing a major engineering challenge - Mike Woof reports. The new Sheikh Jaber Al-Ahmad Al-Sabah Causeway Project being built across the Bay of Kuwait is a massive engineering project that is costing around US$3 billion in all. This highly complex project involves the design, build, completion and maintenance of the causeway, which spans Kuwait Bay between Kuwait City and the Subiyah area. The 36km Sheikh Jaber Al-Ahmad Al-Sabah Cau
  • All aboard the Wirtgen paving train on Germany’s A7 project
    February 21, 2019
    The A7 is being widened between Hamburg and Bordesholm from four lanes to six - in some places to eight - to ensure the motorway remains an efficient traffic artery. The aim is to create a pavement with a high degree of driving comfort but which withstands the loads of heavy-goods traffic. For widening the 60km stretch in the Schleswig-Holstein region, consortium Via Solutions Nord and joint venture ARGE A7 Hamburg-Bordesholm opted for steel reinforced concrete paving with an exposed aggregate concrete s
  • New milling and stabilisation technology is coming to market
    May 29, 2013
    An array of new developments in the market for road recycling and stabilisation machines as well as milling equipment is now on offer - Mike Woof reports. Major new developments are being seen in the sector for road recycling and stabilisation equipment, as well as milling machines. New models are coming to market that benefit from the latest low emission engine technology to meet the increasingly tough European and North American requirements.