Skip to main content

Hong Kong boundary crossing facility

A new Hong Kong Boundary Crossing Facilities (HKBCF) project has been built that will reduce travel times for drivers. The HKBCF is intended as a clearance facility for vehicles that either leave or enter Hong Kong across the new Hong Kong-Zhuhai-Macao Bridge (HZMB). In addition, the HKBCF is intended to operate as a strategic multi-modal transportation hub located on the west of Hong Kong. Construction of the HKBCF has involved reclaiming some 130ha of land from the water to the North East of Hong Kong
November 7, 2018 Read time: 2 mins
Construction work at the HKBCF has required the use a number of pavers and compactors from Dynapac
A new Hong Kong Boundary Crossing Facilities (HKBCF) project has been built that will reduce travel times for drivers.


The HKBCF is intended as a clearance facility for vehicles that either leave or enter Hong Kong across the new Hong Kong-Zhuhai-Macao Bridge (HZMB).

In addition, the HKBCF is intended to operate as a strategic multi-modal transportation hub located on the west of Hong Kong. Construction of the HKBCF has involved reclaiming some 130ha of land from the water to the North East of Hong Kong International Airport. The project has also included erecting buildings and various transport facilities.

Costing some USxx billion (HK$35.9 billion) the work has required the use of an extensive range of machines. Road construction equipment has been provided by equipment supplier Realtech, which delivered a number of 206 Dynapac units for the job. The construction work has used Dynapac SD2500CS and SD2500WS asphalt pavers as well as

Dynapac compactors such as the CA2500 and CC4200VI. In all Realtech has being providing support for the 15 Dynapac units employed on the project.

For more information on companies in this article

Related Content

  • Meeting the challenge of desert runway resurfacing
    April 13, 2012
    Ferocious daytime temperatures can provide a tough challenge to construction firms working in desert conditions in Egypt's south. Despite the high daytime temperatures however, Egyptian contractor Orascom has managed to complete an airport project on budget and ahead of schedule, while meeting the client's tight specifications. The firm has just completed the project to revamp Suhag Airport in the south of the country. This airport now features a new runway, taxiways and aircraft hard standing, as well as n
  • The concrete option
    July 31, 2012
    Concrete highway construction techniques and technology continues to evolve. Mike Woof reports The recent increases in oil costs are having a knock-on effect for the road construction sector, as asphalt prices have increased noticeably and faster than those for concrete. This has spurred renewed discussion over which construction technique now offers the best long term solution for road building. The debate between those in favour of concrete and those preferring asphalt for highway construction has been on
  • XCMG machines working on Pakistan road project
    March 7, 2018
    XCMG has supplied a large fleet of construction machines for use on the construction of the Karachi-Lahore Highway in Pakistan.
  • New bridge link for Oregon-Washington
    April 25, 2012
    The US Department of Transportation has given the go-ahead for the I-5 Columbia River Crossing project, which will link Washington and Oregon states. The plans involve replacing the existing Interstate 5 Columbia River Crossing Bridges and building a new interstate transit link.