Skip to main content

Hong Kong boundary crossing facility

A new Hong Kong Boundary Crossing Facilities (HKBCF) project has been built that will reduce travel times for drivers. The HKBCF is intended as a clearance facility for vehicles that either leave or enter Hong Kong across the new Hong Kong-Zhuhai-Macao Bridge (HZMB). In addition, the HKBCF is intended to operate as a strategic multi-modal transportation hub located on the west of Hong Kong. Construction of the HKBCF has involved reclaiming some 130ha of land from the water to the North East of Hong Kong
November 7, 2018 Read time: 2 mins
Construction work at the HKBCF has required the use a number of pavers and compactors from Dynapac
A new Hong Kong Boundary Crossing Facilities (HKBCF) project has been built that will reduce travel times for drivers.


The HKBCF is intended as a clearance facility for vehicles that either leave or enter Hong Kong across the new Hong Kong-Zhuhai-Macao Bridge (HZMB).

In addition, the HKBCF is intended to operate as a strategic multi-modal transportation hub located on the west of Hong Kong. Construction of the HKBCF has involved reclaiming some 130ha of land from the water to the North East of Hong Kong International Airport. The project has also included erecting buildings and various transport facilities.

Costing some USxx billion (HK$35.9 billion) the work has required the use of an extensive range of machines. Road construction equipment has been provided by equipment supplier Realtech, which delivered a number of 206 Dynapac units for the job. The construction work has used Dynapac SD2500CS and SD2500WS asphalt pavers as well as

Dynapac compactors such as the CA2500 and CC4200VI. In all Realtech has being providing support for the 15 Dynapac units employed on the project.

For more information on companies in this article

Related Content

  • Innovations in formwork aid project completion
    February 14, 2012
    Innovative formwork solutions are helping to get projects completed on or before time, meaning savings in time and money as Patrick smith reports. The use of flexible, modular formwork to create innovative structures out of concrete is helping to increase productivity and thus drive down completion time and costs.
  • Pre-stressed bridge decks use modular formwork system
    July 9, 2012
    Imaginative formwork, often using modular components, is helping to shape some challenging bridges worldwide. Patrick Smith reports Traffic volumes in and around Prague have swollen massively in recent years, pushing the existing road network to the limits of its capacity. To permanently ease congestion in the Czech capital's centre, a multi-lane orbital motorway is under construction as a high capacity bypass for central Prague and to link up all the motorways and other major highways radiating from the ci
  • Copy of New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk