Skip to main content

Hong Kong boundary crossing facility

A new Hong Kong Boundary Crossing Facilities (HKBCF) project has been built that will reduce travel times for drivers. The HKBCF is intended as a clearance facility for vehicles that either leave or enter Hong Kong across the new Hong Kong-Zhuhai-Macao Bridge (HZMB). In addition, the HKBCF is intended to operate as a strategic multi-modal transportation hub located on the west of Hong Kong. Construction of the HKBCF has involved reclaiming some 130ha of land from the water to the North East of Hong Kong
November 7, 2018 Read time: 2 mins
Construction work at the HKBCF has required the use a number of pavers and compactors from Dynapac
A new Hong Kong Boundary Crossing Facilities (HKBCF) project has been built that will reduce travel times for drivers.


The HKBCF is intended as a clearance facility for vehicles that either leave or enter Hong Kong across the new Hong Kong-Zhuhai-Macao Bridge (HZMB).

In addition, the HKBCF is intended to operate as a strategic multi-modal transportation hub located on the west of Hong Kong. Construction of the HKBCF has involved reclaiming some 130ha of land from the water to the North East of Hong Kong International Airport. The project has also included erecting buildings and various transport facilities.

Costing some USxx billion (HK$35.9 billion) the work has required the use of an extensive range of machines. Road construction equipment has been provided by equipment supplier Realtech, which delivered a number of 206 Dynapac units for the job. The construction work has used Dynapac SD2500CS and SD2500WS asphalt pavers as well as

Dynapac compactors such as the CA2500 and CC4200VI. In all Realtech has being providing support for the 15 Dynapac units employed on the project.

For more information on companies in this article

Related Content

  • Building Egypt's world class Desert Highway
    April 13, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong
  • New bridge refurbishment solutions now available
    July 15, 2015
    An array of new bridge refurbishment and repair solutions are available – Mike Woof writes Around the world there are many bridges requiring repairs or refurbishment, and there is a ready market for novel solutions to upgrade existing structures. New developments offer quicker and more efficient ways to improve bridge surfaces and structural performance and add new life to ageing designs. Spancrete is broadening the availability of its novel precast building solutions worldwide by offering these to th
  • Building Egypt's world class Desert Highway
    February 9, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports
  • A new highway for northern Colombia
    July 17, 2023
    The Pamplona-Cúcuta highway is playing an important role for the development of northern Colombia