Skip to main content

Hong Kong boundary crossing facility

A new Hong Kong Boundary Crossing Facilities (HKBCF) project has been built that will reduce travel times for drivers. The HKBCF is intended as a clearance facility for vehicles that either leave or enter Hong Kong across the new Hong Kong-Zhuhai-Macao Bridge (HZMB). In addition, the HKBCF is intended to operate as a strategic multi-modal transportation hub located on the west of Hong Kong. Construction of the HKBCF has involved reclaiming some 130ha of land from the water to the North East of Hong Kong
November 7, 2018 Read time: 2 mins
Construction work at the HKBCF has required the use a number of pavers and compactors from Dynapac
A new Hong Kong Boundary Crossing Facilities (HKBCF) project has been built that will reduce travel times for drivers.


The HKBCF is intended as a clearance facility for vehicles that either leave or enter Hong Kong across the new Hong Kong-Zhuhai-Macao Bridge (HZMB).

In addition, the HKBCF is intended to operate as a strategic multi-modal transportation hub located on the west of Hong Kong. Construction of the HKBCF has involved reclaiming some 130ha of land from the water to the North East of Hong Kong International Airport. The project has also included erecting buildings and various transport facilities.

Costing some USxx billion (HK$35.9 billion) the work has required the use of an extensive range of machines. Road construction equipment has been provided by equipment supplier Realtech, which delivered a number of 206 Dynapac units for the job. The construction work has used Dynapac SD2500CS and SD2500WS asphalt pavers as well as

Dynapac compactors such as the CA2500 and CC4200VI. In all Realtech has being providing support for the 15 Dynapac units employed on the project.

For more information on companies in this article

Related Content

  • Innovations are pushing boundaries in the concrete road paving sector
    February 18, 2013
    The concrete road paving market continues to develop - Mike Woof reports Concrete road paving technology continues to evolve, with new equipment and techniques coming to market. Although concrete road construction has been used for many years, problems with early generation technologies affected this market segment. The first concrete roads were constructed in sections, which led to problems at joints but these were addressed many years ago with the advent of slipform paving. Concrete roads constructed in t
  • Istanbul’s new airport benefits from Wirtgen Group machines
    November 22, 2017
    Construction of Istanbul’s new airport facility is benefiting from the use of a large fleet of machines from the Wirtgen Group. When it is complete, this will be the world’s largest airport and will be able to handle 150-200 million passengers/year as well as 6 million tonnes of freight/year. This will make the facility substantially larger than the world’s current largest airport, the Hartsfield-Jackson Atlanta International Airport, which handles around 105 million passengers/year.
  • Houston Airport paving work for Dynapac
    May 23, 2022
    Equipment from Dynapac is playing an important role in improving facilities at Houston Airport. The firm´s TH E technology has been employed to deliver a surface to grade, with high levels of pre-compaction and also automation.
  • Lower Thames Crossing contractor shortlist
    September 27, 2021
    The contractor shortlist has been announced for part of the Lower Thames Crossing.