Skip to main content

High performance pavers build high performance track

Work on the new Formula 1 racing circuit in Abu Dhabi is progressing at high speed. Over 6,000 construction personnel are working in the United Arab Emirates (UAE) to complete the new high-speed circuit and its infrastructure. German contractor Bickhardt-Bau is carrying out the paving work, using a fleet of new Vögele pavers and Hamm compaction rollers.
February 29, 2012 Read time: 3 mins
Paving work for the new UAE racetrack has been carried out hot to hot, with two SUPER 1900-2 pavers working together on the straights
Work on the new Formula 1 racing circuit in Abu Dhabi is progressing at high speed. Over 6,000 construction personnel are working in the United Arab Emirates (UAE) to complete the new high-speed circuit and its infrastructure. German contractor 3357 Bickhardt Bau is carrying out the paving work, using a fleet of new 1194 Vögele pavers and 228 Hamm compaction rollers.

The contract has been challenging with 5.5km of paving for the race track, pit lanes, paddocks and emergency roads. As this is a race track and the vehicles using it reach incredibly high speeds, build quality has had to be to the highest possible standards in terms of factors such as structural strength, smoothness and skid resistance. In all, the project in Abu Dhabi has required laying 950,000tonnes of crushed stone for the base course and surfacing 750,000m² with 210,000tonnes of asphalt.

The contractor is using two high-performance SUPER 1900-2 pavers equipped with AB600-2TP2 screeds. The high compaction screeds are proving valuable for laying the different courses to the high standards required. For the base and binder courses, the high compaction exerted by the tamper and twin pressure bars on these screeds has been particularly important. In this configuration, the pavers have delivered pre-compaction of 92% and more.

Contractor Bickhardt Bau met the high requirements in terms of accuracy using the sophisticated Niveltronic Plus control system fitted to the Vögele pavers as this package provides automated grade and slope control. On the racetrack, 20m wide, base and binder courses were paved on most sections and these were installed in four strips of 5m each. When paving the 80mm base course for the straights and wide bends, Bickhardt Bau installed a tensioned wire on the outer side of the first strip. For the adjacent strips, the firm used the slope sensor combined with a multiple sonic sensor tracing the previously paved strip. On the tight bends, a tensioned wire traced by the multiple sonic sensor, was used for all four strips.

The composition of the mix is key to racetrack construction: on a crushed-stone base, 50cm thick and spread by graders, 80mm asphalt base (0/19) was paved. The binder course, laid in a thickness of 40mm, is aggregate with a maximum grain size of 14mm bonded with polymer modified bitumen. For the surface course, a special mix for racing circuits was used, based on aggregate with a grain size distribution of (0/11).

For more information on companies in this article

Related Content

  • Eurovia races against the clock for London’s Race of Champions
    June 17, 2016
    Fast-track construction has taken on a new meaning following the successful staging of the Race of Champions in London’s Olympic Stadium. The knockout tournament for the world’s best drivers – won by Formula 1 driver Sebastian Vettel – required a super-fast construction and dismantling of a safe, high-speed circuit within the Queen Elizabeth Olympic Stadium. Eurovia UK had just four weeks to design the track, complete trials and mobilise for the project following the contract award. The circuit was co
  • A special smooth road surface
    August 12, 2022
    Contractor Tarmac has delivered a high- quality finish for a novel underground automotive test track.
  • Wirtgen releases new Vögele paver and Hamm compactor
    November 26, 2014
    The Wirtgen Group is now offering variants of its latest Vögele asphalt pavers and Hamm asphalt compactors. The new Vögele Super 2100-3 and Super 1900-3 pavers and Hamm HD12VO and HD10VO compactors are all now built in the firm’s Chinese plant. The pavers feature a lengthened design with a bigger hopper, to allow greater material capacity and are special variants for this major market. The 2.42m long hopper in the Super 2100-3L has been extended by 320mm over the recently launched model sold into other mark
  • Wirtgen releases new Vögele paver and Hamm compactor
    January 6, 2017
    The Wirtgen Group is now offering variants of its latest Vögele asphalt pavers and Hamm asphalt compactors. The new Vögele Super 2100-3 and Super 1900-3 pavers and Hamm HD12VO and HD10VO compactors are all now built in the firm’s Chinese plant. The pavers feature a lengthened design with a bigger hopper, to allow greater material capacity and are special variants for this major market. The 2.42m long hopper in the Super 2100-3L has been extended by 320mm over the recently launched model sold into other mark