Skip to main content

Gipave - in it for the long haul in Italy

Graphene-enhanced additive Gipave, from Iterchimica, has been used in binder layers of Italy’s A4 motorway in a 28-year rehabilitation trial.
By Kristina Smith June 21, 2023 Read time: 2 mins
Work on the 5.5km-long section of Italy's A4 motorway

Graphene-enhanced Gipave additive, developed by Italian specialist Iterchimica, has been used in the binder layers of Italy’s A4 motorway in a rehabilitation intervention designed to last for 28-years. The goal is to lower maintenance costs and carbon emissions as well as conserve resources.

Motorway operator Autostrada Brescia-VeronaVicenza-Padova is responsible for the A4 motorway which runs between Brescia and Padova in Italy. This is a route carrying very heavy traffic - an average of 95,000 vehicles daily, of which 25% are heavy goods vehicles. On a 5.5km-long section of the eastbound motorway towards Padova, the operator is trialling an approach that aims to deliver a higher performance highway, with different materials and interventions used on the different lanes.

For the slow lane, the contractor milled and removed the entire depth of asphalt, stabilised the ground beneath to a depth of 300mm and then laid a 120mm modified bitumen base, a 70mm-thick binder layer modified with Gipave and a 50mm layer of soundabsorbing porous asphalt.

For the middle lane, only the asphalt layers were replaced and for the third one, only the surfacing layer. Gipave technology was selected due to its superior performance compared to mixes made with standard polymer modified bitumens.

Gipave combines graphene with polymers extracted from carefully selected waste hard plastics, which would not normally be recycled. Iterchimica developed Gipave in a six-year research and development programme, working with graphene supplier Directa Plus, G.Eco and the University of Milan Bicocca. The first trial section was laid in Italy in 2018 and further trial sections laid in the UK and Brazil.

To plan repairs and other interventions on the motorway, Autostrada Brescia-VeronaVicenza-Padova uses a pavement management system into which survey information and other data can be fed. The software then uses algorithms and models to forecast what interventions will be needed when. The main parameters that are monitored and entered into the system are the Sideways Force Coefficient, Roughness Index of Roads, Wearing Course Permeability, layer thickness using a GPR georadar and deflection analysis.

For the rehabilitation project, a software design package was used to determine the layer thicknesses needed. Using inputs including traffic volumes, climate and the properties of various materials, the pavement design was produced to give a design life of 28 years with a reliability index of 99%.

Should the life expectancy of the reconstructed pavement be as designed, the operator has calculated that the savings due to reduced maintenance will result in 42% fewer carbon emissions per km, 33% less bitumen and 34% less energy consumption.

For more information on companies in this article

Related Content

  • Asphalt reinforcement extends road life
    July 12, 2012
    Special reinforcements can extend the life of an old or new road, and also offer environmental benefits. Patrick Smith reports. Asphalt reinforcement can extend the service life of a resurfaced road by a factor of 3-4, says Huesker, developers of the HaTelit range of asphalt reinforcement. Aimed at preventing the propagation of reflective cracking from an old asphalt layer through a new surface course, Huesker claims the formation of reflective cracking is considerably delayed or even completely prevented u
  • Pavement preservation techniques
    February 16, 2012
    In this second article of a three-part series on pavement preservation, Alan S. Kercher, of Kercher Engineering, discusses the different techniques that can be utilised as part of the preservation toolbox
  • Pavement preservation techniques
    April 12, 2012
    In this second article of a three-part series on pavement preservation, Alan S. Kercher, of Kercher Engineering, discusses the different techniques that can be utilised as part of the preservation toolbox An agency should utilise a comprehensive preservation toolbox that includes various techniques, which can be applied to specific needs. There is no one technique that will cost-effectively address all pavement problems. However, there are many preservation techniques that can provide an agency with the ab
  • Waste to road construction
    December 13, 2022
    In Australia, the use of waste materials in roads, including higher proportions of RAP, is gaining pace. Meanwhile, the industry in the US is looking to invest in net zero technologies