Skip to main content

Geveko’s ChipFill makes its mark

Geveko Markings says that it’s preformed thermoplastic called ChipFill can be used for repairing cracks and smaller holes in surfaces other than asphalt Repairs made with ChipFill can be done in only 20 minutes without the need for bulky machinery, according to the company. All that is needed is a brush and a gas burner. Until now, ChipFill has been used widely for road repair, but it offers easy solutions for other problems as well, such as reseating cobblestones. Thermoplastic and preformed thermoplas
March 28, 2018 Read time: 2 mins
The hot applied thermoplastic ChipFill has a better bonding with underlying asphalt than cold process applications, according to Geveko
Geveko Markings says that it’s preformed thermoplastic called ChipFill can be used for repairing cracks and smaller holes in surfaces other than asphalt


Repairs made with ChipFill can be done in only 20 minutes without the need for bulky machinery, according to the company. All that is needed is a brush and a gas burner.

Until now, ChipFill has been used widely for road repair, but it offers easy solutions for other problems as well, such as reseating cobblestones. Thermoplastic and preformed thermoplastic applied on cobblestones can cause problems as it is prone to crack due to stones shifting. By reseating the cobblestones with ChipFill, markings material such as PreMark, made by US-based company Ennis-Flint, will have their life greatly extended, according to 2447 Geveko.

Surfaces can be levelled by filling the space between cobblestones with ChipFill. This makes the cobblestones both easier and safer to walk on – especially for pedestrians wearing high heels.

ChipFill can secure the area around manhole covers and drain holes. As opposed to cold applied asphalts, the hot applied thermoplastic ChipFill has a better bonding with underlying asphalt. This is because the binders in the thermoplastic bond with the bitumen in the asphalt when heated. As a bonus, Chipfill does not allow water to pass through the material.

ChipFill consists of small chips which makes it extremely easy to work with. Simply pour on the material where needed and sweep up the excess material to save it for later use. This means no waste, but also no mess as you can easily sweep unwanted chips off the surface before applying heat with the gas burner leaving no marks on the actual cobblestones.

For more information on companies in this article

Related Content

  • Rubber recycling for South African roads
    November 5, 2012
    South Africa takes crumb rubber use to the next level - *Anders Marschall Jensen The preservation of the environment is a global concept, and in the road construction industry, it is all about preservation of roads. In earlier days, roads were built with the primary goal of moving passenger traffic from one place to another, but these days, roads are very different. Not only is there passenger traffic, and more of it, but roads must also deal with extensive movement of products in heavy vehicles. Therefore,
  • Bitumen technology reduces maintenance costs
    April 12, 2023
    Looming net zero deadlines, and impetus from the private sector are accelerating the take up of carbon-saving technologies
  • Bertha ends her Alaskan Way voyage in Seattle
    December 21, 2017
    Seattle's State Route 99 viaduct is coming down. David Arminas was on site. Bertha, the world’s largest diameter earth pressure balance tunnel boring machine, with a cutterhead diameter of 17.5m, is no more. Her 2.7km journey underneath the waterfront area of Seattle finished on April 4 and the power went off for the last time on an extraordinary TBM that had finally completed an extraordinary job. “A small sidewalk job would have had more impact on city traffic than we have had,” says Brian Russell a v
  • Topcon: A revolution in construction technology’s coming
    July 7, 2021
    The construction equipment industry is at a turning point. Topcon’s senior leaders believe that we are about to see a huge surge in the adoption of new construction technologies. The time is ripe as a new, younger and more tech-savvy generation comes to the fore. Governments could save billions, and where does the smartphone fit in?