Skip to main content

Geveko’s ChipFill makes its mark

Geveko Markings says that it’s preformed thermoplastic called ChipFill can be used for repairing cracks and smaller holes in surfaces other than asphalt Repairs made with ChipFill can be done in only 20 minutes without the need for bulky machinery, according to the company. All that is needed is a brush and a gas burner. Until now, ChipFill has been used widely for road repair, but it offers easy solutions for other problems as well, such as reseating cobblestones. Thermoplastic and preformed thermoplas
March 28, 2018 Read time: 2 mins
The hot applied thermoplastic ChipFill has a better bonding with underlying asphalt than cold process applications, according to Geveko
Geveko Markings says that it’s preformed thermoplastic called ChipFill can be used for repairing cracks and smaller holes in surfaces other than asphalt


Repairs made with ChipFill can be done in only 20 minutes without the need for bulky machinery, according to the company. All that is needed is a brush and a gas burner.

Until now, ChipFill has been used widely for road repair, but it offers easy solutions for other problems as well, such as reseating cobblestones. Thermoplastic and preformed thermoplastic applied on cobblestones can cause problems as it is prone to crack due to stones shifting. By reseating the cobblestones with ChipFill, markings material such as PreMark, made by US-based company Ennis-Flint, will have their life greatly extended, according to 2447 Geveko.

Surfaces can be levelled by filling the space between cobblestones with ChipFill. This makes the cobblestones both easier and safer to walk on – especially for pedestrians wearing high heels.

ChipFill can secure the area around manhole covers and drain holes. As opposed to cold applied asphalts, the hot applied thermoplastic ChipFill has a better bonding with underlying asphalt. This is because the binders in the thermoplastic bond with the bitumen in the asphalt when heated. As a bonus, Chipfill does not allow water to pass through the material.

ChipFill consists of small chips which makes it extremely easy to work with. Simply pour on the material where needed and sweep up the excess material to save it for later use. This means no waste, but also no mess as you can easily sweep unwanted chips off the surface before applying heat with the gas burner leaving no marks on the actual cobblestones.

For more information on companies in this article

Related Content

  • LafargeHolcim delivers Algeria concrete road solution
    May 14, 2018
    In Algeria, LafargeHolcim has introduced roller compacted concrete (RCC) for the first time in the country to renovate the RN45 road, with reduced costs, construction time and increased durability - *Nicolas Miravalls. Heavy traffic on a road stretch in northern Algeria has resulted in the need for rebuilding of the link, making it better able to cope with demand. In Algeria’s Msila region, the RN 45 road carries over 700 heavy load trucks/day, 365 days/year and required a major re-construction. In 2017, La
  • Wirtgen’s asphalt plant technology
    September 29, 2020
    Wirtgen’s asphalt plant technology offering includes both the Benninghoven and Ciber brands
  • Advancing asphalt paving technology
    April 5, 2016
    Asphalt paver manufacturers are meeting demands for high performance machines that can deliver a quality mat - Mike Woof reports Major manufacturers are rolling out ranges of new asphalt pavers designed to meet the latest emissions regulations for Europe, as well as developing models to suit customers in developing nations. The firms have designed many of the latest machines to meet tough new emissions legislation, although versions will also be available for less regulated markets also. Ammann has up
  • Asphalt plant upgrade in Germany
    May 8, 2019
    An asphalt plant upgrade has helped boost long-term efficiency for a producer in southern Germany. The firm, Fiegl, based in Bavaria, invested in a new asphalt mixing plant four years ago. More recently, the firm also replaced the plant’s baghouse. The retrofit has since helped lower the plant’s emissions, noise output and fuel consumption. The time frame for the retrofit was tight because it was important to avoid lengthy downtime and production outages in mid-season. This meant that the changeover had to