Skip to main content

Geveko’s ChipFill makes its mark

Geveko Markings says that it’s preformed thermoplastic called ChipFill can be used for repairing cracks and smaller holes in surfaces other than asphalt Repairs made with ChipFill can be done in only 20 minutes without the need for bulky machinery, according to the company. All that is needed is a brush and a gas burner. Until now, ChipFill has been used widely for road repair, but it offers easy solutions for other problems as well, such as reseating cobblestones. Thermoplastic and preformed thermoplas
March 28, 2018 Read time: 2 mins
The hot applied thermoplastic ChipFill has a better bonding with underlying asphalt than cold process applications, according to Geveko
Geveko Markings says that it’s preformed thermoplastic called ChipFill can be used for repairing cracks and smaller holes in surfaces other than asphalt


Repairs made with ChipFill can be done in only 20 minutes without the need for bulky machinery, according to the company. All that is needed is a brush and a gas burner.

Until now, ChipFill has been used widely for road repair, but it offers easy solutions for other problems as well, such as reseating cobblestones. Thermoplastic and preformed thermoplastic applied on cobblestones can cause problems as it is prone to crack due to stones shifting. By reseating the cobblestones with ChipFill, markings material such as PreMark, made by US-based company Ennis-Flint, will have their life greatly extended, according to 2447 Geveko.

Surfaces can be levelled by filling the space between cobblestones with ChipFill. This makes the cobblestones both easier and safer to walk on – especially for pedestrians wearing high heels.

ChipFill can secure the area around manhole covers and drain holes. As opposed to cold applied asphalts, the hot applied thermoplastic ChipFill has a better bonding with underlying asphalt. This is because the binders in the thermoplastic bond with the bitumen in the asphalt when heated. As a bonus, Chipfill does not allow water to pass through the material.

ChipFill consists of small chips which makes it extremely easy to work with. Simply pour on the material where needed and sweep up the excess material to save it for later use. This means no waste, but also no mess as you can easily sweep unwanted chips off the surface before applying heat with the gas burner leaving no marks on the actual cobblestones.

For more information on companies in this article

Related Content

  • Importance of road/tunnel drainage systems
    May 8, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports. The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Thermal Road Repairs heats up the pavement surfacing market
    November 28, 2016
    UK-based company Thermal Road Repairs says it has developed a paver-mounted system that enhances pavement surfacing. The unit eliminates joints in asphalt repair so extends the life of the pavement, resulting in significant cost savings and less disruption to the road network, according to Thermal Road,
  • Screening efficiency
    May 22, 2012
    Hanson UK’s Ingleton Quarry is improving screening efficiency by employing new ceramic lining technology. The facility has taken advantage of the latest developments from Sandvik to improve performance with the replacement of existing quenched steel liners with ceramic inserts. The quarry, located in the Yorkshire Dales National Park, had wear problems with the steel wear protection plates used in the screening process. This cut efficiency while the plates were also noisy. In order to address the problem th
  • Brazilian contractor uses novel methods for high quality road
    January 5, 2015
    Cold-in place recycling method provides fast road rebuild in Brazil In Brazil a road contractor has carried out a high quality road rebuilding job, using novel techniques. Contractor Brown Brown is located in Santa Teresinha in the state of Bahia and recently carried out a two-week job for the company to rehabilitate sections of highway BR-381. The highway is an important route in Brazil and runs from Sao Paulo to Belo Horizonte. Highway BR-381 or Rodovia Fernão Dias, as it is called, stretches some 576km