Skip to main content

Faster repairs

Viatec says that the latest version of its Viafix instant cold road repair material offers speedy and reliable pothole repairs. The product has now been well-proven and is winning customers in the UK, such as Wiltshire County Council. Viafix is said to conform to customer needs for reduced repair costs and increased efficiency can cope with both wet and cold conditions and can be used in an array of rural and urban applications, whether traffic loads are heavy or light.
March 1, 2012 Read time: 2 mins
Viatec's proven Viafix pothole patching solution
3476 Viatec says that the latest version of its Viafix instant cold road repair material offers speedy and reliable pothole repairs. The product has now been well-proven and is winning customers in the UK, such as Wiltshire County Council. Viafix is said to conform to customer needs for reduced repair costs and increased efficiency can cope with both wet and cold conditions and can be used in an array of rural and urban applications, whether traffic loads are heavy or light.

This product is cheaper to use than conventional repair methods that rely on larger crews and materials being supplied in a hotbox according to Viatec. Before Viafix was introduced in Wiltshire, the roadmenders were laying, on average, 1.35tonnes of hot material/day. Once Viafix was introduced this increased to 3.5tonnes/day, representing an almost 60% reduction in cost/tonne of material. In addition, transport costs were reduced as fewer trips to the larger sites were required, while wastage costs of were also reduced.

For more information on companies in this article

Related Content

  • Highways England opts for warm mix asphalt
    August 26, 2021
    The company in charge of maintaining England’s strategic highways, including motorways and main roads, is officially shifting its preference towards using warm mix asphalt. Highways England lays out the case for its decision.*
  • Clean running haulers
    February 14, 2012
    Volvo Construction Equipment says that its all-new F-Series ADTs will meet the tough Tier 4 Interim/Stage IIIB emissions legislation as well as delivering performance improvements over previous models.
  • Swell times for swale construction with a Sidewinder
    October 9, 2018
    Specialised swale construction featured in Northern England recently UK contractor Balfour Beatty examined different methods for building swales along the Norwich Northern Distributor Road near the English city of Norwich. Balfour decided to trial specialised road-widening machines, specially configured excavator buckets and modified compaction equipment. Excavators and dump trucks prepared the area for placement of sub-base material. The swale areas were constructed using both conventional methods as wel
  • Attachment options for milling
    July 31, 2024
    New milling attachments are now available