Skip to main content

Fast resurfacing work

A Wirtgen W210 milling machine has played an important role in improving a race track in the UK. Specialist contractor Jordan Road Surfacing used the machine to help finish a major refurbishment at Mallory Park race circuit on budget and a week early.
February 22, 2012 Read time: 1 min
A 2395 Wirtgen W210 milling machine has played an important role in improving a race track in the UK. Specialist contractor Jordan Road Surfacing used the machine to help finish a major refurbishment at Mallory Park race circuit on budget and a week early. Championship motorcycle races began at the Midlands' premier race venue last month after resurfacing of the 2.25km track that organisers say will see lap times tumble for the 2011 season. Some 3,000tonnes of surfacing material was laid, overall. The results are said to be good and racers who have tried the track say that the surface is smoother than the old and has a lot more grip.

The W210 is an innovative machine powered by twin engines and features a 2.2m wide milling drum. The machine can be tailored to suit conditions and has three selectable milling drum speeds, suiting large-scale surface course rehabilitation, complete pavement removal at full depth or fine milling. Other features include automatic parallel alignment, intelligent track drive control to maximise traction, and Wirtgen's proprietary Widrive machine management and Level Pro levelling systems.

For more information on companies in this article

Related Content

  • Wirtgen introduces top of the line milling machine
    January 6, 2017
    Wirtgen is introducing a powerful and productive new milling machine in the shape of its W 250i. This high-performance planer is the company's most powerful cold milling machine. The machine is available with an extra-large milling drum unit for a working width of 3.8m, offering a 70% increase in milling width over a standard machine and a notable increase in performance. It also sports a camera system and the Vacuum Cutter System (VCS). High rates of productivity, maximum cost efficiency and the eco-friend
  • Wirtgen paving technology takes off at Frankfurt
    February 27, 2017
    Time was at a premium for Wirtgen machinery when resurfacing the runway at Frankfurt/Main Airport Europe’s third largest airport, Frankfurt/Main, has new surface course on runways about every seven year, including the centre runway, the most-frequently used section.
  • Multiple milling machines removing surface
    April 24, 2019
    Milling subcontractor Pavement Recycling Systems removed thousands of tonnes of reclaimed asphalt pavement (RAP) from a runway at Oakland International Airport in California recently. The firm used a fleet of six Wirtgen W 210i cold milling machines to remove the asphalt in less than 60 hours from Runway 12-30, along the shore of San Francisco Bay. In total, 47,000tons of asphalt were milled within a 60-hour time frame, nonstop day and night, plus a single-shift second phase a week later. The firm start
  • Accurate milling and paving with Wirtgen
    March 15, 2022
    Equipment from the Wirtgen Group, including equipment from Vögele, Hamm and Benninghoven, have been used to resurface the Silverstone circuit